ELE96-00065
| INSP - Final | 1/25/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | A | CANC |
|
|
01/25/96 336 - REINSPECTION AFTER 9:30 Not permited by structural
|
ELE96-00276
| INSP - Ele Rough-In/Perm Svc | 1/25/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | A | PASS |
|
|
01/25/96 336 - BLDG B R/I Ok P/S Ok
|
ELE96-00280
| INSP - Ele Rough-In/Perm Svc | 1/25/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | A | PASS |
|
|
01/25/96 336 - R/I Ok P/S Ok
|
ELE96-00291
| INSP - Electrical Rough-In | 1/26/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | P | FAIL |
|
|
01/26/96 336 - SERVICE UPGRADE 3RMS P/S disapproved grounding electrode and raised cover mounted receps circuit directory.
|
ELE96-00096
| INSP - Electrical Rough-In | 1/26/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | P | PASS |
|
|
01/26/96 336 - THIS IS FOR THE CEILING. R/I ok
|
ELE96-00190
| INSP - Electrical Rough-In | 1/26/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | P | PASS |
|
|
01/26/96 336 - Partial r/i ok
|
ELE2057346
| INSP - Electrical Rough-In | 1/25/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | P | PASS |
|
|
01/26/96 336 - 2ND FLOOR CEILING--3RD FLOOR COLUMNS partial R/i ok
|
ELE96-00053
| INSP - Final | 1/26/1996 | 1/26/1996 | 1/26/1996 12:00:00 AM | P | FAIL |
|
|
01/26/96 336 - FINAL final disapproved location of counter outlet
|