Inspections for the day of: Wednesday, January 26, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC00-00242 Final1/24/20001/26/20001/26/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/24/2000 at 17:01:49. Contact: ###-####.
MEC00-00238 Final1/25/20001/26/20001/26/2000 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 01/25/2000 at 06:14:51. Contact: ###-####. Spacer at wall does not have the spacers at the inner collar. 1/26/00 2:43:30 PM
BLD99-02431 BLD-Final1/25/20001/26/20001/26/2000 12:00:00 AMAFAIL
Key on the front porch screen window sill under the nails Larry Peterson ###-####
BLD99-02609 BLD-Final1/26/20001/26/20001/26/2000 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 01/26/2000 at 07:27:28. Contact: ###-####.
BLD99-03605 BLD-Energy code compliance1/25/20001/26/20001/26/2000 12:00:00 AMAPASS
energy code insp ###-####
BLD00-00078 BLD-Footing1/25/20001/26/20001/26/2000 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 01/25/2000 at 13:32:55. Contact: ###-####. No approved plans, rebar not in. 1/26/00 2:42:57 PM
BLD00-00161 BLD-Framing/Rough-in1/25/20001/26/20001/26/2000 12:00:00 AMPPART
###-#### ED need electrical approved. 1/27/00 2:37:45 PM
MEC00-00244 Final1/26/20001/26/20001/26/2000 12:00:00 AMPFAIL
###-#### b vent not connected with addequate nut bolt connections also three sections are slip joint type pipe should only use one. 1/27/00 2:37:30 PM
BLD99-01841 BLD-Framing/Rough-in1/26/20001/26/20001/26/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 01/26/2000 at 10:38:04. Contact: . plans on site do not have attached building department documents left c/n on site. 1/27/00 2:38:28 PM
BLD99-01838 BLD-Framing/Rough-in1/26/20001/26/20001/26/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 01/26/2000 at 10:39:34. Contact: . plans on site do not have attached documents left c/n posted on site 1/27/00 2:39:19 PM
BLD99-01840 BLD-Framing/Rough-in1/26/20001/26/20001/26/2000 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 01/26/2000 at 10:41:10. Contact: . plans on site do not have attached documents left c/n posted on site 1/27/00 2:39:51 PM
MEC00-00216 Rough-in1/25/20001/26/20001/26/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 01/25/2000 at 13:02:06. Contact: ###-####.