BLD00-01294
| BLD-Final | 1/25/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | A | PASS |
|
|
PJ Smith ###-#### C/C issued. 1/26/2001 9:06:37 AM
|
BLD01-00052
| BLD-Foundation | 1/25/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD00-03467
| BLD-Final | 1/25/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | A | PASS |
|
|
###-#### C/C issued 1/26/2001 12:37:15 PM
|
BLD00-03470
| BLD-Framing/Rough-in | 1/25/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | A | FAIL |
|
|
###-#### Chuck C/N Hold Down nailing. 1/26/2001 10:05:03 AM
|
MEC00-03739
| Final | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | PASS |
|
|
Judy ###-#### key is above front door front door is not taped.
|
MEC00-04109
| Final | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 09:31:46. Contact: ###-####. C/N posted... Contr called. 1/26/2001 2:22:58 PM
|
BLD00-02015
| BLD-Final | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | PASS |
|
|
fn occ doug- ###-#### -key above front door in window seal C/C issued 1/26/2001 3:29:45 PM
|
MEC00-04285
| Final | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 09:59:38. Contact: ###-####. C/N..Need electr to test hood, prot. post, seal A/C & cond. lines, Insulate boots.... 1/26/2001 2:55:54 PM
|
BLD00-03642
| BLD-Footing | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 10:06:27. Contact: ###-####. Foot for crawl..OK 1/26/2001 2:46:39 PM
|