BLD01-00081
| BLD-Foundation | 1/25/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | A | PART |
|
|
###-####, add hd's as needed...chk at shear in 1/26/2001 11:33:00 AM sp 1/26/2001 11:33:02 AM
|
BLD00-02654
| BLD-Final | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | FAIL |
|
|
fn occ don ###-#### ok for t/o, need complete storefront, obtain other final 1/26/2001 3:07:37 PM
|
BLD00-03335
| BLD-Final | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | FAIL |
|
|
don ###-#### fn occ, c/n, rails. ok for t/o 1/26/2001 3:58:46 PM
|
BLD01-00045
| BLD-Framing/Rough-in | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 10:31:17. Contact: ###-####.c/n, ok to ins. 1/26/2001 3:57:00 PM
|
BLD01-00045
| BLD-Framing/Rough-in | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 10:31:17. Contact: ###-####.c/n, ok to ins. 1/26/2001 3:57:00 PM
|
BLD00-03605
| BLD-Conference | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 1/26/2001 1:51:46 PM w/ Bldr. re insul
|
BLD00-03524
| BLD-Conference | 1/26/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 1/26/2001 3:05:31 PM w/ bldr, use 2hr assy at infill at stair
|
BLD00-03070
| BLD-Framing/Rough-in | 1/25/2001 | 1/26/2001 | 1/26/2001 12:00:00 AM | P | PART |
|
|
grid inspection jack ###-####9, part, add spreaders. 1/26/2001 5:26:20 PM
|