MEC06-00283
| Rough-in | 1/26/2006 | 1/26/2006 | 1/27/2006 4:07:05 PM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/26/2006 at 7:27:24 AM. Contact: ###-####. contractor changed gas supply to duplex with 2lb system, unit at east side still needs test approved
|
MEC06-00268
| Pressure Test | 1/26/2006 | 1/26/2006 | 1/27/2006 9:29:01 AM | | PASS |
|
|
John ###-#### -- rough in and pressure test
|
MEC06-00264
| Final | 1/26/2006 | 1/26/2006 | 1/26/2006 3:57:28 PM | P | FAIL |
|
|
William -- cell # ###-####-- call 1st before insp for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong support flue every 4', flue grade back to furnace
|
MEC06-00278
| Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 3:33:21 PM | P | PASS |
|
|
Please call job foreman, Rich Scown - ###-####. Internet Inspection Request from: RaChelle Meister
|
MEC05-04240
| Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 2:58:55 PM | A | FAIL |
|
|
Contact person sharon; Phone #: ###-#### Internet Inspection Request from: Sharon Ginter framing needs to be completed at fireplace near garage, flex duct through second level ceiling may need to be draftstopped at ceiling- framing not completed
|
MEC06-00100
| Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 2:29:02 PM | A | PASS |
|
|
Kevin is the contact, Thanks; Phone #: ###-#### Internet Inspection Request from: Sheri Lilya pressure tests ok
|
MEC06-00127
| Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 1:59:51 PM | A | PASS |
|
|
fireplace inspection; Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN
|
MEC05-02506
| Final | 1/26/2006 | 1/26/2006 | 1/26/2006 1:44:55 PM | P | FAIL |
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS unable to locate secondary drain to furnace at third level, please verify location
|
MEC06-00294
| Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 12:57:14 PM | A | CANC |
|
|
PAT PAGER #99763; Phone #: ###-#### Internet Inspection Request from: RaChelle Meister
|
MEC05-03930
| Pressure Test | 1/25/2006 | 1/26/2006 | 1/26/2006 10:14:53 AM | A | PASS |
|
|
Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN
|
MEC05-03930
| Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 10:14:28 AM | A | PASS |
|
|
Phone #: ###-#### x111 Internet Inspection Request from: LINDA DORN
|
MEC06-00251
| Pressure Test | 1/25/2006 | 1/26/2006 | 1/26/2006 9:15:35 AM | A | CANC |
|
|
laurie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
MEC06-00251
| Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 9:15:16 AM | A | FAIL |
|
|
laurie; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa still need to seal and insulate taps at round plenum
|
MEC06-00253
| Final | 1/25/2006 | 1/26/2006 | 1/26/2006 9:01:37 AM | A | PASS |
|
|
Glen Scheid; Phone #: ###-#### Internet Inspection Request from: Monica Henderson
|
MEC05-02700
| Final | 1/26/2006 | 1/26/2006 | 1/26/2006 12:00:00 AM | P | PASS |
|
|
|
MEC06-00278
| Final | 1/26/2006 | 1/26/2006 | 1/26/2006 12:00:00 AM | P | PASS |
|
|
Please call job foreman, Rich Scown - ###-####. Internet Inspection Request from: RaChelle Meister
|
MIS06-00015
| FIR-Final | 1/25/2006 | 1/26/2006 | 1/25/2006 1:10:24 PM | P | CANC |
|
|
pending bld fn -shaun horn at ###-#### cell- call 1st before insp need to schedule with forest, gave forest the information
|