Inspections for the day of: Thursday, January 26, 2006.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD05-03203 BLD-Footing1/26/20061/26/20061/26/2006 3:51:34 PMPPART
Santos -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. wip
BLD05-02912 BLD-Footing1/26/20061/26/20061/26/2006 3:50:08 PMPPART
Santos -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Noted added reinforcement in footings. wip
BLD05-01944 BLD-Framing/Rough-in1/23/20061/26/20061/26/2006 3:49:08 PMPPART
I would have had you do this in the morning with the to greystone houses but I don't think this would be ready for you untill the afternoon. Sorry. Internet Inspection .Request from: Carey Allen. Needs to add lateral bracing to top chord of truss at overbuild. ok to insulate.
BLD05-03395 BLD-Framing/Rough-in1/26/20061/26/20061/26/2006 2:16:11 PMPPASS
ben ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
BLD06-00039 BLD-Footing1/24/20061/26/20061/26/2006 1:56:23 PMPPASS
concrete pouring at 3pm//greg; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
BLD05-03131 BLD-Framing/Rough-in1/25/20061/26/20061/26/2006 10:32:15 AMAPART
Jim -- partial insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Bldg. conference on insulating the attic.
BLD05-02731 BLD-Foundation1/25/20061/26/20061/26/2006 10:07:52 AMADONE
Scheduled by a contractor via Hello! on 1/25/2006 at 3:05:09 PM. Contact: ###-####. Not a foundation insp. Bldg. confrence. Reviewed all special insp reports for compliance on footings foundations and masonry wall constructed to date.
BLD05-03125 BLD-Foundation1/25/20061/26/20061/26/2006 9:48:58 AMAPART
Jared; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Concrete already placed in stemwall when on site.
BLD06-00042 BLD-Footing1/25/20061/26/20061/26/2006 9:24:38 AMAPART
Ed -- reschedule footing insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Footings not covered overnight, frozen and covered with snow. Ed was notified of footing conditions over phone.
BLD05-02089 BLD-Footing1/25/20061/26/20061/26/2006 9:05:44 AMAPASS
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Interior column pad footings. Contractor is getting special inspections.
BLD05-00962 BLD-Final1/23/20061/26/20061/26/2006 8:10:42 AMANR
Phone #: ###-#### Internet Inspection Request from: Carey Allen. Needs elec. final.
BLD05-01947 BLD-Final1/23/20061/26/20061/26/2006 8:10:14 AMANR
Phone #: ###-#### Internet Inspection Request from: Carey Allen. Needs elec. and plumbing finals first.