BLD05-03203
| BLD-Footing | 1/26/2006 | 1/26/2006 | 1/26/2006 3:51:34 PM | P | PART |
|
|
Santos -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. wip
|
BLD05-02912
| BLD-Footing | 1/26/2006 | 1/26/2006 | 1/26/2006 3:50:08 PM | P | PART |
|
|
Santos -- call 1st before insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Noted added reinforcement in footings. wip
|
BLD05-01944
| BLD-Framing/Rough-in | 1/23/2006 | 1/26/2006 | 1/26/2006 3:49:08 PM | P | PART |
|
|
I would have had you do this in the morning with the to greystone houses but I don't think this would be ready for you untill the afternoon. Sorry. Internet Inspection .Request from: Carey Allen. Needs to add lateral bracing to top chord of truss at overbuild. ok to insulate.
|
BLD05-03395
| BLD-Framing/Rough-in | 1/26/2006 | 1/26/2006 | 1/26/2006 2:16:11 PM | P | PASS |
|
|
ben ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD06-00039
| BLD-Footing | 1/24/2006 | 1/26/2006 | 1/26/2006 1:56:23 PM | P | PASS |
|
|
concrete pouring at 3pm//greg; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-03131
| BLD-Framing/Rough-in | 1/25/2006 | 1/26/2006 | 1/26/2006 10:32:15 AM | A | PART |
|
|
Jim -- partial insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Bldg. conference on insulating the attic.
|
BLD05-02731
| BLD-Foundation | 1/25/2006 | 1/26/2006 | 1/26/2006 10:07:52 AM | A | DONE |
|
|
Scheduled by a contractor via Hello! on 1/25/2006 at 3:05:09 PM. Contact: ###-####. Not a foundation insp. Bldg. confrence. Reviewed all special insp reports for compliance on footings foundations and masonry wall constructed to date.
|
BLD05-03125
| BLD-Foundation | 1/25/2006 | 1/26/2006 | 1/26/2006 9:48:58 AM | A | PART |
|
|
Jared; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Concrete already placed in stemwall when on site.
|
BLD06-00042
| BLD-Footing | 1/25/2006 | 1/26/2006 | 1/26/2006 9:24:38 AM | A | PART |
|
|
Ed -- reschedule footing insp; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong. Footings not covered overnight, frozen and covered with snow. Ed was notified of footing conditions over phone.
|
BLD05-02089
| BLD-Footing | 1/25/2006 | 1/26/2006 | 1/26/2006 9:05:44 AM | A | PASS |
|
|
mike; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa. Interior column pad footings. Contractor is getting special inspections.
|
BLD05-00962
| BLD-Final | 1/23/2006 | 1/26/2006 | 1/26/2006 8:10:42 AM | A | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Carey Allen. Needs elec. final.
|
BLD05-01947
| BLD-Final | 1/23/2006 | 1/26/2006 | 1/26/2006 8:10:14 AM | A | NR |
|
|
Phone #: ###-#### Internet Inspection Request from: Carey Allen. Needs elec. and plumbing finals first.
|