Inspections for the day of: Tuesday, January 26, 2010.
Number of inspections: 7
Percentage of inspections complete: 86 %
Percentage of inspections not complete: 14 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00675 INSP-Final Inspection1/22/20101/25/2010 A 
trent Phone #: ###-####
FIR09-00607 FIR-Aging Inspection1/26/20101/26/20101/26/2010 5:13:10 PM DONE
Need site inspection request for permit final.
FIR09-00472 INSP-Final Inspection1/26/20101/26/20101/26/2010 5:12:07 PMAPASS
Fire sprinkler permit work okayed for final. Inspection completed in conjunction with project related fire alarm testing finished 11/25/09.
FIR09-00082 INSP-Final Inspection1/25/20101/26/20101/26/2010 5:08:10 PMAFAIL
Need to provide verification that tamper switches at the pit backflow shutoff valves #1 and 2 are connected to the panel- as FLP wire is disconnected and exposed at a junction box labeled "pit valve os&y" in the riser room. Also need to retest alarm signals as the manual pull station failed to report.
FIR09-00016 INSP-Final Inspection1/25/20101/26/20101/26/2010 5:02:32 PMAPASS
Fire alarm testing completed satisfactory, permit finaled.
FIR09-00530 INSP-Final Inspection1/25/20101/26/20101/26/2010 5:01:50 PMAFAIL
On site netcon rating reported as 7, at the time of inspection.
BLD09-02123 FIRE-Final Inspection1/25/20101/26/20101/26/2010 12:23:42 PMAPASS
Fire life safety inspection passed, corrections completed acceptable, project related fire alarm permit work passed.