Inspections for the day of: Tuesday, January 26, 2010.
Number of inspections: 24
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-01844 BLD-Aging Inspection1/26/20101/26/20101/26/2010 4:26:12 PM NR
MIS09-00139 MIS-Aging Inspection1/26/20101/26/20101/26/2010 4:25:00 PM DONE
MIS09-00139 DOC - Permit Expired1/26/20101/26/20101/26/2010 4:24:51 PMPPASS
It appears that all issues with plumbing were resolved by plumbing inspector. Permit is expired.
BLD09-01880 BLD-Aging Inspection1/26/20101/26/20101/26/2010 4:22:36 PM PASS
BLD09-01880 DOC - Permit Finaled1/26/20101/26/20101/26/2010 4:22:28 PMPPASS
Demo is completed. TI work has also been finaled.
BLD09-00863 BLD-Final1/26/20101/26/20101/26/2010 4:21:41 PMPNR
Cell number above is for homeowner. Bruce Young, please contact for access. Phone #: ###-#### Internet Inspection Request from: Scott Zierler. Needs elec. final. Called Scott Zierler to notify him. He will recall final when elec. has finaled.
ESC09-00778 Site Preparation1/26/20101/26/20101/26/2010 4:04:43 PMPPASS
ESC permit sign posted. BMP's in place. contractor using plastic swimming pools for washout and cleanup. Noted heavy rain, no trackout noted, all excavations are contained in backyard.
BLD09-02172 BLD-Other1/25/20101/26/20101/26/2010 4:02:23 PMPPASS
Lane-Checking re-bar in pool Phone #: ###-####
ESC09-00730 Site Final1/26/20101/26/20101/26/2010 2:59:56 PMPPASS
ESC09-00730 DOC - Permit Finaled1/26/20101/26/20101/26/2010 2:59:48 PMPPASS
Final stabalization has been completed.
BLD09-02050 BLD-Final1/26/20101/26/20101/26/2010 2:59:16 PMPPASS
Arlin-PLeae call prior to inspection Phone #: ###-####
BLD09-02050 DOC - Permit Finaled1/26/20101/26/20101/26/2010 2:59:07 PMPPASS
Letter of compliance was isued.
ESC08-00657 Site Final1/26/20101/26/20101/26/2010 2:01:35 PMPPASS
ESC08-00657 DOC - Permit Finaled1/26/20101/26/20101/26/2010 2:01:27 PMPPASS
Final stabalization completed. All BMP's removed.
BLD08-01682 BLD-Final1/26/20101/26/20101/26/2010 2:00:56 PMPNR
Todd Phone #: ###-####. Everything ok, Mech failed. Needs to recall insp. once mech has passed.
BLD09-02227 BLD-Framing/Rough-in1/26/20101/26/20101/26/2010 1:08:08 PMPPASS
Interior steel stud framed walls, 1st. floor ok.
BLD09-02003 BLD-Framing/Rough-in1/26/20101/26/20101/26/2010 1:07:28 PMPCANC
Dan Phone #: ###-####
ESC10-00005 Random Inspection1/26/20101/26/20101/26/2010 12:10:22 PMAPASS
BLD10-00021 BLD-Footing1/25/20101/26/20101/26/2010 12:10:02 PMAPART
Chris Phone #: ###-####. wip.
GCB09-00078 GCB-Framing1/25/20101/26/20101/26/2010 11:08:07 AMAPART
Contact Rob ###-####. Interior steel stud non load bearing wall, already covered. Noted to contractor to provide the bracing at top of wall as shown on approved plans. Needs to pull elec. permit, and discuss mech. permit issue with city hall.
BLD09-02205 BLD-Energy code compliance1/25/20101/26/20101/26/2010 10:04:13 AMAPASS
Carmeron Phone #: ###-####
BLD09-01843 BLD-Final1/25/20101/26/20101/26/2010 10:03:56 AMAFAIL
Larry Phone #: ###-####. Needs to provide insulation cert. and post. c/n posted.
ESC09-00656 Site Final1/26/20101/26/20101/26/2010 10:03:14 AMAFAIL
Final stabalization has not yet been completed. Fine grading compleed. Site is clean.
ESC09-00784 Random Inspection1/26/20101/26/20101/26/2010 9:41:27 AMAPASS