Inspections for the day of: Tuesday, January 26, 2010.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00030 Site Preparation1/26/20101/26/20101/27/2010 11:26:24 AM FAIL
Verbal message to RP:
1. CLean up all hard surface of all sediment and debris.
2. Protect the storm drain inlet to the north of project area.
Will re-inspect on 1/28/10 am.
ESC10-00018 Site Preparation1/26/20101/26/20101/26/2010 4:41:54 PMPPART
Verbal to RP:
Remove all concrete washout residual at the end of street where pump truck washed out last week. Will re-inspect on 2/1/10.
ESC09-00791 General Inspection1/26/20101/26/20101/26/2010 4:23:07 PMPFAIL
Verbal to RP to protect the storm drain basin located behind the Rite Aid with some type of sediment barrier. will re-inspect on 2/1/10
ESC09-00793 Site Preparation1/26/20101/26/20101/26/2010 4:21:29 PMPFAIL
Per the issues pertaining with the correction notice given by #450. Verbally spoke to RP via phone call over the violations that still need to be corrected:
1. Maintain the storm drain inlet protect since has exceeded 50% compacity.
2. Install and / or replace the sediment barrier per Boise City Erosion Control Field Manual.
3. Place all trash debris that is on the project area into the container that has been provided.
Photos taken of the violations that still are present.
Once complete, call to request an inspection to lift the soft hold.
ESC10-00011 Site Preparation1/19/20101/26/20101/26/2010 3:43:45 PMACANC
ESC10-00004 Site Preparation1/21/20101/26/20101/26/2010 9:31:27 AMADONE
No activity today due to weather conditions.
ESC09-00507 Random Inspection1/26/20101/26/20101/26/2010 9:30:36 AMPPASS
Clean run off of the project. Very minumal runoff.
ESC10-00010 Site Preparation1/22/20101/26/20101/26/2010 9:09:05 AMAPASS
Dewatering at the North west end of project into the pond. NO issues present.
ESC10-00005 Site Preparation1/26/20101/26/20101/26/2010 9:01:30 AMAPASS
ESC09-00386 Tracking Control1/25/20101/26/20101/26/2010 8:40:57 AMPPASS
Issues have been corrected. Told RP to have contractors clean tire off if covered with mud prior to leaving the job site by going back and forth on the construction exit.
ESC09-00312 Site Preparation1/26/20101/26/20101/26/2010 8:33:10 AM NR
Will re-inspect with rP on 1/27/10.
ESC09-00710 Site Preparation1/26/20101/26/20101/26/2010 8:22:59 AM NR
ESC10-00033 Site Preparation1/26/20101/26/20101/26/2010 7:26:07 AM DONE
completed om 1/25/10