BLD11-00135
| BLD-Framing/Rough-in | 1/26/2011 | 1/26/2011 | 1/26/2011 5:44:26 PM | P | PASS |
|
|
mark Phone #: ###-####
|
BLD11-00056
| BLD-Final | 1/26/2011 | 1/26/2011 | 1/26/2011 3:51:49 PM | P | PASS |
|
|
eldon Phone #: ###-#### OK for Perm Occ.
|
BLD10-02974
| BLD-Other | 1/26/2011 | 1/26/2011 | 1/26/2011 3:50:22 PM | P | PASS |
|
|
Please call 1/2 hour prior upon arrival, thanks! Phone #: ###-#### >> Inspection requested via web by Darren Gossett..............Grid....OK
|
MIS10-00213
| BLD-Final | 1/25/2011 | 1/26/2011 | 1/26/2011 3:49:01 PM | P | PASS |
|
|
Gary Phone #: ###-####
|
MIS10-00213
| DOC - Permit Finaled | 1/26/2011 | 1/26/2011 | 1/26/2011 3:48:50 PM | P | PASS |
|
|
|
BLD11-00017
| BLD-Energy code compliance | 1/25/2011 | 1/26/2011 | 1/26/2011 1:07:12 PM | A | PASS |
|
|
Erby Phone #: ###-####
|
BLD10-02245
| BLD-Framing/Rough-in | 1/25/2011 | 1/26/2011 | 1/26/2011 1:06:26 PM | A | FAIL |
|
|
After 9 if possible---Kurt Phone #: ###-#### Talked to Contractor and Owner......Scope of work does not include framed mezzanine/stairway/etc. Need to resubmit new modified plans showing all framing. Also advised to complete all trade rough-ins prior to calling for frame insp. No inspection completed.
|
BLD05-00867
| BLD-Final | 1/25/2011 | 1/26/2011 | 1/26/2011 12:11:31 PM | A | FAIL |
|
|
chris Phone #: ###-#### C/N ..... Need min. 1 1/2" clearance between handrail and exterior wall.......Exterior stairway. Manager (Chris) said his notice and Order deadline is Feb 9th...and will try to get handrail and final inspection done before that date. He emmediately made a call to Contractor. and is going ahead in good faith to meet deadline.
|
ESC10-00570
| Site Final | 1/25/2011 | 1/26/2011 | 1/26/2011 10:49:58 AM | A | FAIL |
|
|
Brett phone...... Need to complete landscaping.
|
ESC10-00569
| Site Final | 1/25/2011 | 1/26/2011 | 1/26/2011 10:48:47 AM | A | FAIL |
|
|
Brett phone .. Not ready Need to complete landscaping.
|