NAF14-00010
| INSP-Sprinkler Rough-in | 1/26/2016 | 1/26/2016 | 1/26/2016 4:19:16 PM | P | DONE |
|
|
Reinspected @ 4pm. Adjustments/additional insulation added. At time of inspection tenting ok.
Tenting inspection @ 1:30pm. Found a trouble spot in small bathroom. Called Anthony to adjust insulation.
|
GCB15-00063
| FIRE-Final Inspection | 1/25/2016 | 1/26/2016 | 1/26/2016 2:10:41 PM | P | PASS |
|
|
Fire Life Safety Pass. Verified all exterior egress lighting, door hardware, and sprinkler escutcheons/ceiling tiles.
Extinguishers missing from mezzanines in production area. Contractor receiving two this afternoon. To be verified by Building Inspector.
Occupant Load signs present, not hung.
|