ELE99-04474
| Final | 1/26/2000 | 1/27/2000 | 1/27/2000 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/26/2000 at 11:39:03. Contact: ###-####. final ok no card 1/27/00 2:50:58 PM
|
ELE99-04230
| Final | 1/26/2000 | 1/27/2000 | 1/27/2000 12:00:00 AM | A | PASS |
|
|
Don ###-#### final ok unclassfied fuel dispensing fuel oil only 1/27/00 2:50:43 PM
|
ELE99-04585
| Electrical Rough-In | 1/26/2000 | 1/27/2000 | 1/27/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/26/2000 at 15:30:54. Contact: ###-####. most of norht end floor ik 1/27/00 2:49:46 PM
|
ELE00-00127
| Electrical Rough-In | 1/27/2000 | 1/27/2000 | 1/27/2000 12:00:00 AM | P | NR |
|
|
Marc ###-####. not ready canceled 1/28/00 8:16:34 AM
|
ELE00-00269
| Electrical Rough-In | 1/27/2000 | 1/27/2000 | 1/27/2000 12:00:00 AM | P | PASS |
|
|
ED--- ###-#### R/I kitchen r/i ok 1/28/00 8:15:37 AM
|
ELE00-00254
| Electrical Rough-In | 1/25/2000 | 1/27/2000 | 1/27/2000 12:00:00 AM | P | PASS |
|
|
###-#### r/i p/s ok 1/28/00 8:16:08 AM
|