Inspections for the day of: Tuesday, January 27, 2004.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC04-00229 Pressure Test1/26/20041/27/20041/27/2004 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 1/26/2004 at 12:19:40 PM. Contact: ###-####. There is more work here than just gas test, no one at site left c/n to obtain permits for additional mechanical , and plumbing, electrical etc. as I can not obtain access at this time to see what other work. 1/27/2004 10:38:41 AM
BLD03-02960 BLD-Final1/26/20041/27/20041/27/2004 12:00:00 AMANR
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs electrical prior. 1/27/2004 10:59:30 AM
BLD03-02467 BLD-Final1/26/20041/27/20041/27/2004 12:00:00 AMAPASS
Herb, ###-####. Ok perm oc schell and core finaled. 1/27/2004 11:14:23 AM
BLD03-02139 BLD-Final1/26/20041/27/20041/27/2004 12:00:00 AMAPASS
Herb, ###-#### Ok perm oc, schell and core finaled. 1/27/2004 11:13:04 AM
BLD03-02233 BLD-Final1/26/20041/27/20041/27/2004 12:00:00 AMANR
call 1st before insp -bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Needs mec,ele and plm permits finaled, I called this number and left a mesage, need to recall when these are obtained. 1/27/2004 11:10:27 AM
MEC04-00200 Final1/26/20041/27/20041/27/2004 12:00:00 AMAPASS
bill please call 10 min before so he can be there to meet you; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD03-02852 BLD-Final1/27/20041/27/20041/27/2004 12:00:00 AMAPASS
ok perm oc. 1/27/2004 11:50:00 AM
BLD03-00804 BLD-Final1/26/20041/27/20041/27/2004 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 1/26/2004 at 11:15:24 AM. Contact: ###-####. called and told person that allsignatuers on card must be signed before an inspection can be done. 1/27/2004 4:46:59 PM
BLD03-01794 BLD-Final1/27/20041/27/20041/27/2004 12:00:00 AMPFAIL
please call for access//camil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Needs floor insulation 1/27/2004 4:39:41 PM
BLD03-02630 BLD-Final1/27/20041/27/20041/27/2004 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 1/27/2004 at 8:16:52 AM. Contact: ###-####. Needs mechanical final first. 1/27/2004 4:38:57 PM
BLD03-01135 BLD-Conference1/26/20041/27/20041/27/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 1/26/2004 at 4:38:52 PM. Contact: ###-####. Ceiling grid ok,have details from architect. also talked about access for sinks. 1/27/2004 4:42:32 PM
BLD04-00004 BLD-Footing1/26/20041/27/20041/27/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 1/26/2004 at 4:45:19 PM. Contact: ###-####. poured appears ok. 1/27/2004 4:39:12 PM