MEC04-00229
| Pressure Test | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 12:19:40 PM. Contact: ###-####. There is more work here than just gas test, no one at site left c/n to obtain permits for additional mechanical , and plumbing, electrical etc. as I can not obtain access at this time to see what other work. 1/27/2004 10:38:41 AM
|
BLD03-02960
| BLD-Final | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | NR |
|
|
brian; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie needs electrical prior. 1/27/2004 10:59:30 AM
|
BLD03-02467
| BLD-Final | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | PASS |
|
|
Herb, ###-####. Ok perm oc schell and core finaled. 1/27/2004 11:14:23 AM
|
BLD03-02139
| BLD-Final | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | PASS |
|
|
Herb, ###-#### Ok perm oc, schell and core finaled. 1/27/2004 11:13:04 AM
|
BLD03-02233
| BLD-Final | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | NR |
|
|
call 1st before insp -bill; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie Needs mec,ele and plm permits finaled, I called this number and left a mesage, need to recall when these are obtained. 1/27/2004 11:10:27 AM
|
MEC04-00200
| Final | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | PASS |
|
|
bill please call 10 min before so he can be there to meet you; Phone #: ###-#### Internet Inspection Request from: Darla Downs
|
BLD03-02852
| BLD-Final | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | PASS |
|
|
ok perm oc. 1/27/2004 11:50:00 AM
|
BLD03-00804
| BLD-Final | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 11:15:24 AM. Contact: ###-####. called and told person that allsignatuers on card must be signed before an inspection can be done. 1/27/2004 4:46:59 PM
|
BLD03-01794
| BLD-Final | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | FAIL |
|
|
please call for access//camil; Phone #: ###-#### Internet Inspection Request from: Barbara Moore. Needs floor insulation 1/27/2004 4:39:41 PM
|
BLD03-02630
| BLD-Final | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 1/27/2004 at 8:16:52 AM. Contact: ###-####. Needs mechanical final first. 1/27/2004 4:38:57 PM
|
BLD03-01135
| BLD-Conference | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 4:38:52 PM. Contact: ###-####. Ceiling grid ok,have details from architect. also talked about access for sinks. 1/27/2004 4:42:32 PM
|
BLD04-00004
| BLD-Footing | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 1/26/2004 at 4:45:19 PM. Contact: ###-####. poured appears ok. 1/27/2004 4:39:12 PM
|