BLD03-02043
| FIRE-Final Inspection | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | PASS |
|
|
fire life safety finaled 1/27/2004 9:12:10 AM
|
FIR03-00816
| INSP-Sprinkler Rough-in/Hydro | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | A | FAIL |
|
|
Plans do not match the installed piping for layout or for pipe size. Sidewall head, on east side, in lobby needs to be extended coverage. Resubmitt plans 1/27/2004 10:11:15 AM
|
FIR03-00505
| INSP-Final Inspection | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | FAIL |
|
|
provide knox box, provide map at the annunciator and label the zones at the annunciator 1/27/2004 1:52:28 PM
|
FIR03-00692
| INSP-Sprinkler Rough-in/Hydro | 1/26/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | PART |
|
|
Office areas are ok to cover 1/27/2004 1:49:28 PM
|
FIR03-00776
| INSP-Final Inspection | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | CANC |
|
|
walt; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
FIR03-00816
| INSP-Sprinkler Rough-in | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | PART |
|
|
Fire sprinkler piping in the office area is OK for cover per the resubmitted plans approved on 1/27/04 1/27/2004 3:19:15 PM
|
BLD02-02743
| FIRE-Conference | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | DONE |
|
|
emergency lighting and exit signs as installed operated ok. No other items inspected
|
FIR03-00774
| INSP-Final Inspection | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | PASS |
|
|
Fire sprinklers finaled
|
FIR04-00031
| INSP-Final Inspection | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy until duct detectors have been tested
|
BLD03-02250
| FIRE-Final Inspection | 1/27/2004 | 1/27/2004 | 1/27/2004 12:00:00 AM | P | PART |
|
|
A temporary occupancy until duct detectors have been tested under the fire alarm permit. All other life safety items are OK
|