FIR04-00490
| INSP-Sprinkler Rough-in/Hydro | 1/23/2006 | 1/23/2006 | | A | |
|
|
Check for completion.
|
FIR05-00760
| INSP-Final Inspection | 1/27/2006 | 1/27/2006 | 1/27/2006 5:59:46 PM | P | PASS |
|
|
Fire sprinkler work is satisfactory, c/n items have been completed, permit finaled.
|
FIR05-00890
| INSP-Sprinkler Rough-in | 1/26/2006 | 1/27/2006 | 1/27/2006 5:57:32 PM | A | PART |
|
|
Overhead fire sprinkler rough-in is good for cover at the hard lid areas.
|
BLD05-02334
| FIRE-Final Inspection | 1/26/2006 | 1/27/2006 | 1/27/2006 12:36:33 PM | A | PART |
|
|
Life safety c/n items have been completed, life safety is satisfactory for the phase 1 portion of the remodeled building as related to the fire alarm permit phased work. Fire life safety final pending completion of the phase 2 alarm work under permit FIR05-00712.
|
FIR05-00760
| INSP-Sprinkler Rough-in/Hydro | 1/27/2006 | 1/27/2006 | 1/27/2006 12:26:52 PM | A | PART |
|
|
Hydrostatic test of the antifreeze system passed inspection, leakage has been repaired.
|
FIR05-00712
| INSP-Final Inspection | 1/26/2006 | 1/27/2006 | 1/27/2006 12:20:16 PM | A | PART |
|
|
Fire alarm work is acceptable for phase 1of this permit, c/n items related to phase one are complete. Final pending completion, testing, inspection and approval of phase 2 alarm work.
|
FIR05-00746
| INSP-Final Inspection | 1/27/2006 | 1/27/2006 | 1/27/2006 12:16:21 PM | A | PASS |
|
|
Overhead fire sprinkler work passed inspection, c/n items have been completed satisfactory.
|