BLD05-01714
| BLD-Final | 1/26/2006 | 1/27/2006 | 1/30/2006 9:59:37 AM | P | DEFR |
|
|
Scheduled by a contractor via Hello! on 1/26/2006 at 3:05:57 PM. Contact: ###-####. rescheduled
|
BLD05-00364
| BLD-Framing/Rough-in | 1/27/2006 | 1/27/2006 | 1/30/2006 9:58:09 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/27/2006 at 9:38:14 AM. Contact: ###-####.needs to fire caulk walls and floor redo wires for sep ceiling grid
|
MIS06-00020
| BLD-Conference | 1/27/2006 | 1/27/2006 | 1/30/2006 9:56:03 AM | P | DEFR |
|
|
Possible remodel without building permit. The only permit we have is a re-roof rescheduled
|
BLD05-02455
| BLD-Final | 1/26/2006 | 1/27/2006 | 1/30/2006 9:53:12 AM | P | NR |
|
|
call to gain access//troy; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
BLD05-03389
| BLD-Final | 1/25/2006 | 1/27/2006 | 1/27/2006 4:05:54 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/25/2006 at 3:47:32 PM. Contact: ###-####.
|
BLD05-03389
| DOC - Permit Finaled | 1/27/2006 | 1/27/2006 | 1/27/2006 12:00:00 AM | P | PASS |
|
|
|