Inspections for the day of: Friday, January 27, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC06-00305 Final1/27/20061/27/20061/27/2006 3:51:53 PMPPASS
LATE AFTERNOON THIS PROJECT WILL BE DONE, THANKS.; Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe
MEC05-03729 Final1/27/20061/27/20061/27/2006 3:18:33 PMPPASS
Sonja -- key above door for access; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00304 Pressure Test1/27/20061/27/20061/27/2006 3:18:12 PMPPASS
Need Rough in and pressure witness; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
pressure witness only
MEC06-00209 Rough-in1/27/20061/27/20061/27/2006 2:46:28 PMPFAIL
Scheduled by a contractor via Hello! on 1/27/2006 at 8:35:13 AM. Contact: ###-####. csst incorrect size to furnace and w/h, support csst in crawl per installation instructions
MEC05-03634 Final1/27/20061/27/20061/27/2006 2:06:13 PMPPASS
jack ###-####
MEC05-03983 Final1/26/20061/27/20061/27/2006 1:58:13 PMANH
PLEASE CALL LIZ DUESMAN 1 HOUR AHEAD PRIOR TO INSPECTION ###-####, THANK YOU, KAREN; Phone #: ###-#### Internet Inspection Request from: Rick Lake
left message, not home
MEC06-00282 Pressure Test1/26/20061/27/20061/27/2006 1:38:17 PMPPASS
Please inpsect as early in the afternoon as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC06-00282 Final1/26/20061/27/20061/27/2006 1:37:57 PMPPASS
Please inpsect as early in the afternoon as possible. Call with any problems. Thanks, April.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC06-00228 Final1/26/20061/27/20061/27/2006 11:03:27 AMAPASS
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
MEC06-00005 Final1/25/20061/27/20061/27/2006 10:28:52 AMAPASS
Please call Ron before going out; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC06-00180 Pressure Test1/26/20061/27/20061/27/2006 10:28:24 AMAPASS
Scheduled by a contractor via Hello! on 1/26/2006 at 1:39:04 PM. Contact: ###-####.
MEC06-00180 Rough-in1/26/20061/27/20061/27/2006 10:28:07 AMAPASS
Scheduled by a contractor via Hello! on 1/26/2006 at 1:38:46 PM. Contact: ###-####.
MEC06-00268 Rough-in1/26/20061/27/20061/27/2006 9:29:57 AMAFAIL
John ###-#### -- rough in and pressure test
need support gas line every 8'
MEC06-00300 Final1/26/20061/27/20061/27/2006 8:57:45 AMAPASS
Crawl access is on outside of house. Homeowner may or may not be home; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
MEC05-03983 Final1/27/20061/27/20061/27/2006 12:00:00 AMPPASS
final, no mantle installed
MEC05-03069 Final1/26/20061/27/20061/26/2006 12:34:09 PMAPASS
randy ###-####