ESC06-00005
| Aging Inspection | 1/27/2009 | 1/27/2009 | 1/30/2009 4:03:11 PM | A | PASS |
|
|
No activity seen. Building looks vacant.
|
ESC05-01622
| Aging Inspection | 1/27/2009 | 1/27/2009 | 1/30/2009 3:28:50 PM | A | DONE |
|
|
|
ESC05-01414
| Aging Inspection | 1/27/2009 | 1/27/2009 | 1/29/2009 10:53:11 AM | A | DONE |
|
|
|
ESC03-01135
| Aging Inspection | 1/27/2009 | 1/27/2009 | 1/28/2009 3:55:53 PM | A | DONE |
|
|
|
ESC06-00103
| Aging Inspection | 1/27/2009 | 1/27/2009 | 1/28/2009 11:25:05 AM | A | DONE |
|
|
|
ESC05-00683
| Aging Inspection | 1/27/2009 | 1/27/2009 | 1/28/2009 8:21:40 AM | A | DONE |
|
|
|
ESC08-00706
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 4:44:05 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00899
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:52:04 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00900
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:51:53 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00901
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:51:33 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00880
| Tracking Control | 1/27/2009 | 1/27/2009 | 1/27/2009 3:48:20 PM | P | FAIL |
|
|
Left message with RP. Correction Notice: 1. Clean up all sediment and debris off of all hard surfaces. Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
|
ESC08-00881
| Tracking Control | 1/27/2009 | 1/27/2009 | 1/27/2009 3:48:03 PM | P | FAIL |
|
|
Left message with RP. Correction Notice: 1. Clean up all sediment and debris off of all hard surfaces. Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
|
ESC08-00882
| Tracking Control | 1/27/2009 | 1/27/2009 | 1/27/2009 3:47:49 PM | P | FAIL |
|
|
Left message with RP. Correction Notice: 1. Clean up all sediment and debris off of all hard surfaces. Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
|
ESC08-00883
| Tracking Control | 1/27/2009 | 1/27/2009 | 1/27/2009 3:47:36 PM | P | FAIL |
|
|
Left message with RP. Correction Notice: 1. Clean up all sediment and debris off of all hard surfaces. Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
|
ESC08-00888
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:21:22 PM | P | FAIL |
|
|
Left message with RP. Correction Notice: 1. Clean up all hard surfaces of all sediment and debris. 2. Install a stabilized construction entrance to lots. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00886
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:21:04 PM | P | FAIL |
|
|
Left message with RP. Correction Notice: 1. Clean up all hard surfaces of all sediment and debris. 2. Install a stabilized construction entrance to lots. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00885
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:20:47 PM | P | FAIL |
|
|
Left message with RP. Correction Notice: 1. Clean up all hard surfaces of all sediment and debris. 2. Install a stabilized construction entrance to lots. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00886
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:08:54 PM | P | CANC |
|
|
|
ESC08-00889
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:07:17 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00890
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:07:07 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00892
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:06:54 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC08-00894
| BMP Violation | 1/27/2009 | 1/27/2009 | 1/27/2009 3:04:54 PM | P | FAIL |
|
|
Left the message of the C/N with the RP Correction Notice: 1.Clean all hard surfaces of all sediment and debris. 2. Install temporary protection on stockpile that will pervent erosion from occuring. 3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted. Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
|
ESC07-01448
| Site Final | 1/26/2009 | 1/27/2009 | 1/27/2009 10:04:10 AM | A | FAIL |
|
|
Went over issues with the RP on what needs to occur with the project to reach a pass status with a "site final". Nothing will occur until 03-04 of 2009.
|