Inspections for the day of: Tuesday, January 27, 2009.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC06-00005 Aging Inspection1/27/20091/27/20091/30/2009 4:03:11 PMAPASS
No activity seen. Building looks vacant.
ESC05-01622 Aging Inspection1/27/20091/27/20091/30/2009 3:28:50 PMADONE
ESC05-01414 Aging Inspection1/27/20091/27/20091/29/2009 10:53:11 AMADONE
ESC03-01135 Aging Inspection1/27/20091/27/20091/28/2009 3:55:53 PMADONE
ESC06-00103 Aging Inspection1/27/20091/27/20091/28/2009 11:25:05 AMADONE
ESC05-00683 Aging Inspection1/27/20091/27/20091/28/2009 8:21:40 AMADONE
ESC08-00706 BMP Violation1/27/20091/27/20091/27/2009 4:44:05 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00899 BMP Violation1/27/20091/27/20091/27/2009 3:52:04 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00900 BMP Violation1/27/20091/27/20091/27/2009 3:51:53 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00901 BMP Violation1/27/20091/27/20091/27/2009 3:51:33 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00880 Tracking Control1/27/20091/27/20091/27/2009 3:48:20 PMPFAIL
Left message with RP.
Correction Notice:
1. Clean up all sediment and debris off of all hard surfaces.
Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
ESC08-00881 Tracking Control1/27/20091/27/20091/27/2009 3:48:03 PMPFAIL
Left message with RP.
Correction Notice:
1. Clean up all sediment and debris off of all hard surfaces.
Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
ESC08-00882 Tracking Control1/27/20091/27/20091/27/2009 3:47:49 PMPFAIL
Left message with RP.
Correction Notice:
1. Clean up all sediment and debris off of all hard surfaces.
Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
ESC08-00883 Tracking Control1/27/20091/27/20091/27/2009 3:47:36 PMPFAIL
Left message with RP.
Correction Notice:
1. Clean up all sediment and debris off of all hard surfaces.
Failure to comply will result in a stop work order. Will re-inspect on 1/28/09 PM
ESC08-00888 BMP Violation1/27/20091/27/20091/27/2009 3:21:22 PMPFAIL
Left message with RP.
Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Install a stabilized construction entrance to lots.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00886 BMP Violation1/27/20091/27/20091/27/2009 3:21:04 PMPFAIL
Left message with RP.
Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Install a stabilized construction entrance to lots.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00885 BMP Violation1/27/20091/27/20091/27/2009 3:20:47 PMPFAIL
Left message with RP.
Correction Notice:
1. Clean up all hard surfaces of all sediment and debris.
2. Install a stabilized construction entrance to lots.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00886 BMP Violation1/27/20091/27/20091/27/2009 3:08:54 PMPCANC
ESC08-00889 BMP Violation1/27/20091/27/20091/27/2009 3:07:17 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00890 BMP Violation1/27/20091/27/20091/27/2009 3:07:07 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00892 BMP Violation1/27/20091/27/20091/27/2009 3:06:54 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC08-00894 BMP Violation1/27/20091/27/20091/27/2009 3:04:54 PMPFAIL
Left the message of the C/N with the RP
Correction Notice:
1.Clean all hard surfaces of all sediment and debris.
2. Install temporary protection on stockpile that will pervent erosion from occuring.
3.Install external storm drain protection surrounding the inlet. Will not except wattle that is not weighted.
Failure to comply will result in a stop work order. Will re-inspect on 1/29/09 AM.
ESC07-01448 Site Final1/26/20091/27/20091/27/2009 10:04:10 AMAFAIL
Went over issues with the RP on what needs to occur with the project to reach a pass status with a "site final". Nothing will occur until 03-04 of 2009.