BLD09-02251
| BLD-Framing/Rough-in | 1/26/2010 | 1/27/2010 | 1/27/2010 3:04:12 PM | P | PASS |
|
|
Weston Phone #: ###-####
|
BLD09-02217
| BLD-Foundation | 1/27/2010 | 1/27/2010 | 1/27/2010 2:47:08 PM | P | PASS |
|
|
Before 2:30 please-Lee Centers Phone #: ###-####
|
ESC09-00788
| Random Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 2:46:43 PM | P | CANC |
|
|
clint on site.
|
BLD10-00021
| BLD-Foundation | 1/26/2010 | 1/27/2010 | 1/27/2010 10:04:00 AM | A | PART |
|
|
Chris Phone #: ###-####wip
|
ESC10-00005
| Random Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 10:03:38 AM | A | PART |
|
|
wip
|
BLD04-00327
| BLD-Aging Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 10:02:11 AM | | PASS |
|
|
wip
|
BLD06-01149
| BLD-Aging Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 10:01:13 AM | | FAIL |
|
|
the plumbing permit for this job is being finaled out as a rough in only, the owner will need to get a permit to set the fixtures before the building permit can be finaled. bill
|
BLD09-00510
| BLD-Aging Inspection | 1/27/2010 | 1/27/2010 | 1/27/2010 9:56:08 AM | | PASS |
|
|
wip
|
BLD09-02225
| BLD-Framing/Rough-in | 1/26/2010 | 1/27/2010 | 1/27/2010 9:55:11 AM | A | PASS |
|
|
Call ###-#### for access.
|
BLD08-00815
| BLD-Final | 1/27/2010 | 1/27/2010 | 1/27/2010 8:51:00 AM | A | PASS |
|
|
|
BLD08-00815
| DOC - Permit Finaled | 1/27/2010 | 1/27/2010 | 1/27/2010 8:50:44 AM | P | PASS |
|
|
|
ESC08-00334
| Site Final | 1/27/2010 | 1/27/2010 | 1/27/2010 8:43:33 AM | A | PASS |
|
|
|