BLD09-01891
| BLD-Aging Inspection | 1/27/2010 | 1/27/2010 | 2/2/2010 5:20:10 PM | | DONE |
|
|
|
BLD06-01520
| BLD-Aging Inspection | 1/27/2010 | 1/27/2010 | 2/1/2010 2:30:23 PM | | PASS |
|
|
Called and spoke with homeowner, should be done by end of the week and will call in for final.
|
BLD06-01057
| BLD-Aging Inspection | 1/27/2010 | 1/27/2010 | 2/1/2010 2:27:30 PM | | PASS |
|
|
Work is still in progres. Homeowner is doing all the work.
|
BLD09-02226
| BLD-Framing/Rough-in | 1/27/2010 | 1/27/2010 | 1/27/2010 3:26:55 PM | P | PASS |
|
|
###-#### Rustin. Framing ok. %/8 type x added to west soffit and vents removed. East property line has 8ft. set back. ok to insul. ESC issues were aslo resolved.
|
BLD09-01780
| BLD-Final | 1/27/2010 | 1/27/2010 | 1/27/2010 2:55:43 PM | P | PASS |
|
|
Shawn-Please call at least 30 mins prior to inspection Phone #: ###-####
|
BLD09-01780
| DOC - Permit Finaled | 1/27/2010 | 1/27/2010 | 1/27/2010 2:55:34 PM | P | PASS |
|
|
Letter of compliance was issued.
|
ESC09-00793
| BMP Violation | 1/27/2010 | 1/27/2010 | 1/27/2010 1:47:51 PM | P | PASS |
|
|
All issues have been resolved.
|
ESC09-00793
| Site Preparation | 1/26/2010 | 1/27/2010 | 1/27/2010 1:47:26 PM | A | CANC |
|
|
Rustin Phone #: ###-####
|
GCB09-00089
| GCB-Footing | 1/26/2010 | 1/27/2010 | 1/27/2010 11:22:01 AM | A | PASS |
|
|
Contact Cole @###-####. Footings ok.
|
GCB09-00079
| GCB-Fndatn/slab ins/fld vent | 1/26/2010 | 1/27/2010 | 1/27/2010 10:57:37 AM | A | PASS |
|
|
Contact Gery Wylie @###-####. Perimeter stemwall ok.
|
BLD10-00014
| BLD-Framing/Rough-in | 1/26/2010 | 1/27/2010 | 1/27/2010 10:30:10 AM | A | PASS |
|
|
Jentry please call 1 hr brfore going out. this is a locked gate entry Phone #: ###-####. Interior wood framed walls and lid for restrooms.
|
ESC09-00377
| BMP Violation | 1/27/2010 | 1/27/2010 | 1/27/2010 10:06:51 AM | A | PASS |
|
|
All issues have been resolved.
|
BLD09-01007
| BLD-Framing/Rough-in | 1/26/2010 | 1/27/2010 | 1/27/2010 10:06:23 AM | A | PASS |
|
|
Rodney Phone #: ###-####. Reveiwed special insp. reports. Also inspected engineering fix on 2 columns at existing strip mall. Noted that epoxy had special insp. All work done in accordance to engineers RFI. Will have detail scanned into permit.
|
BLD09-02071
| BLD-Other | 1/25/2010 | 1/27/2010 | 1/27/2010 9:23:45 AM | A | PASS |
|
|
Jim Phone #: ###-####. Ceiling grid is ok for cover.
|
GCB09-00089
| GCB-Footing | 1/26/2010 | 1/27/2010 | 1/27/2010 8:19:38 AM | A | CANC |
|
|
Contact Cole @###-####
|
GCB09-00079
| GCB-Fndatn/slab ins/fld vent | 1/26/2010 | 1/27/2010 | 1/27/2010 8:19:25 AM | A | CANC |
|
|
Contact Gery Wylie @###-####
|