Inspections for the day of: Friday, January 27, 2012.
Number of inspections: 15
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00116 BLD-Final1/27/20121/27/20121/27/2012 4:19:31 PMPNR
DAN Phone #: ###-####. Fire/life/safety failed.
BLD10-02069 BLD-Conference1/27/20121/27/20121/27/2012 3:58:27 PMPDEFR
Footing rebar inspection for plan mod # 4 Phone #: ###-#### >> Inspection requested via web by Scott Greer. Special inspector on site.
BLD12-00085 BLD-Final1/26/20121/27/20121/27/2012 3:17:40 PMPNR
After 3pm please--- Lacy Phone #: ###-####. Fire/life/safety failed.
BLD12-00111 BLD-Framing/Rough-in1/27/20121/27/20121/27/2012 2:38:14 PMPPASS
dan - please call 1/2 hr prior so he can meet you there Phone #: ###-####. Interior wood framed wall in bathroom ok.
ESC11-00076 Random Inspection1/27/20121/27/20121/27/2012 2:15:30 PMPPASS
BLD11-00285 BLD-Other1/26/20121/27/20121/27/2012 2:14:03 PMPPASS
Inspection of column at property line. And also question about code. Please call. Thx. Phone #: ###-#### >> Inspection requested via web by Scott Zierler
MIS12-00013 BLD-Conference1/20/20121/27/20121/27/2012 9:47:48 AMADONE
A 5 day notice has been isuued. Aslo spoke with Kevin (owner of big dawg bailbonds) And he noted that he has hired pat mcegan as his architect.
BLD11-00332 BLD-Final1/26/20121/27/20121/27/2012 9:39:18 AMADONE
job was done a long time ago, just didn't get a final inspection//Marshall ###-####
BLD11-00332 DOC - Permit Finaled1/27/20121/27/20121/27/2012 9:39:07 AMPPASS
All work appears to be done in accordance with local codes and ordinances.
MIS11-00163 MIS-Aging Inspection1/27/20121/27/20121/27/2012 9:08:09 AM DONE
MIS11-00163 DOC - Permit Finaled1/27/20121/27/20121/27/2012 9:08:01 AMPPASS
Accessory structure has been reduced in size to 112 s.f. and moved back from property line to 4ft. A building permit is no longer required.
BLD07-01624 BLD-Aging Inspection1/27/20121/27/20121/27/2012 8:23:02 AM DONE
Spoke to phil with valley steel builders, noted to him that carports in keenland sub need to be finaled. Told phil to schedule life/safety and building finals and to coordinate with me and Troy C. to meet him on job site. Also noted to phil that he will need to have the approved set of plans. Note that he phone number for valley steel in contacts has been disconnected. Use number provided in the job history.
BLD07-01623 BLD-Aging Inspection1/27/20121/27/20121/27/2012 8:22:48 AM DONE
Spoke to phil with valley steel builders, noted to him that carports in keenland sub need to be finaled. Told phil to schedule life/safety and building finals and to coordinate with me and Troy C. to meet him on job site. Also noted to phil that he will need to have the approved set of plans. Note that he phone number for valley steel in contacts has been disconnected. Use number provided in the job history.
BLD07-01622 BLD-Aging Inspection1/27/20121/27/20121/27/2012 8:22:36 AM DONE
Spoke to phil with valley steel builders, noted to him that carports in keenland sub need to be finaled. Told phil to schedule life/safety and building finals and to coordinate with me and Troy C. to meet him on job site. Also noted to phil that he will need to have the approved set of plans. Note that he phone number for valley steel in contacts has been disconnected. Use number provided in the job history.
ESC11-00778 Aging Inspection1/27/20121/27/2012