ESC13-00651
| General Inspection | 1/21/2014 | 1/21/2014 | | | |
|
|
|
BLD13-02532
| BLD-Framing/Rough-in | 1/24/2014 | 1/27/2014 | 1/28/2014 9:38:42 AM | P | PASS |
|
|
Travis Phone #: ###-####
|
GCB13-00130
| GCB-Shearwall | 1/27/2014 | 1/27/2014 | 1/28/2014 9:38:21 AM | P | PASS |
|
|
Blake ###-####
|
MIS13-00326
| BLD-Conference | 1/23/2014 | 1/27/2014 | 1/27/2014 3:33:57 PM | A | PEND |
|
|
Vernon Working with Zoning......,.
|
GCB13-00153
| GCB-Shearwall | 1/27/2014 | 1/27/2014 | 1/27/2014 3:28:45 PM | P | PASS |
|
|
Troy ###-####
|
GCB13-00151
| GCB-Framing | 1/24/2014 | 1/27/2014 | 1/27/2014 2:45:59 PM | P | PASS |
|
|
Brett ###-####
|
BLD13-02813
| BLD-Energy code compliance | 1/24/2014 | 1/27/2014 | 1/27/2014 1:13:30 PM | P | PASS |
|
|
Joe-Please call prior to insepction Phone #: ###-####
|
MIS13-00333
| BLD-Conference | 1/24/2014 | 1/27/2014 | 1/27/2014 12:13:06 PM | A | DONE |
|
|
check back......Same....Nothing happening....No one living here No work being done.
|
BLD12-02221
| BLD-Framing/Rough-in | 1/24/2014 | 1/27/2014 | 1/27/2014 12:10:08 PM | A | PART |
|
|
trevor Phone #: ###-#### Framing OK.....OK to insulate after Electr and Mech OK.
|