Inspections for the day of: Monday, January 27, 2014.
Number of inspections: 12
Percentage of inspections complete: 92 %
Percentage of inspections not complete: 8 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00544 General Inspection1/21/20141/21/2014   
BLD13-00012 BLD-Other1/24/20141/27/20141/27/2014 5:00:59 PMPNR
Final inspection for roofing. Please contact Justin ###-####x125 if you have questions. Phone #: ###-#### >> Inspection requested via web by justin barker. No access. Called jUSTIN AND LEFT MESAGE. nO CALL BACK.
BLD13-01960 BLD-Wall Bracing1/27/20141/27/20141/27/2014 2:27:11 PMPPART
rudy Phone #: ###-####. Exterior wall bracing, 2nd story. Still needs to install MSTc 37 floor to floor strap at tall wall.
BLD14-00132 BLD-Conference1/27/20141/27/20141/27/2014 1:50:59 PMPDONE
Phone #: ###-#### >> Inspection requested via web by Chris Howell
BLD14-00132 DOC - Permit Finaled1/27/20141/27/20141/27/2014 1:50:48 PMPPASS
All work appeared to be done in accordance with local codes and ordinances.
ESC14-00010 Site Final1/27/20141/27/20141/27/2014 1:22:13 PMPDONE
ESC14-00010 DOC - Permit Finaled1/27/20141/27/20141/27/2014 1:22:03 PMPPASS
BLD14-00034 BLD-Final1/27/20141/27/20141/27/2014 1:21:36 PMPPASS
Amir Phone #: ###-####
BLD14-00034 DOC - Permit Finaled1/27/20141/27/20141/27/2014 1:21:24 PMPPASS
GCB13-00139 GCB-Final1/24/20141/27/20141/27/2014 11:46:54 AMAFAIL
Mike ###-####. CPmplete airseal on top plates at tall wall, plumbing penetration at top plate by alcove in mud room and linsets at second floor in mech. chase. Also provide the truss engineering so that framing inspection can be completed. Correction notice was posted.
BLD13-01288 BLD-Final1/24/20141/27/20141/27/2014 10:46:52 AMAPART
Temp occ. granted. Wil be ok for eprm occ. once zoning and public works signs perm.
BLD13-03575 BLD-Framing/Rough-in1/24/20141/27/20141/27/2014 9:02:26 AMAPASS
Jake Tucker Phone #: ###-####. Interior steel stud walls at mezz. T.S. coulmns and beam and new header.