FIR14-00659
| INSP-Final Inspection | 1/26/2015 | 1/27/2015 | 1/28/2015 3:18:21 PM | A | PASS |
|
|
Scope of work completed, final walkthrough finished. Hydrostatic test passed.
|
NAF15-00001
| INSP-Sprinkler Rough-in/Hydro | 1/26/2015 | 1/27/2015 | 1/27/2015 3:23:46 PM | A | PART |
|
|
UG fire supply line hydrostatic test completed.
|
FIR14-00726
| INSP-Final Inspection | 1/27/2015 | 1/27/2015 | 1/27/2015 3:22:41 PM | A | PART |
|
|
Notification appliances per the scope of work tested satisfactory.
|
FIR14-00531
| INSP-Sprinkler Rough-in | 1/26/2015 | 1/27/2015 | 1/27/2015 1:28:21 PM | A | PART |
|
|
Center pendent head and branch at the pods tower one podium level thru 4th floor okay for sheetrock ceiling cover.
|
FIR14-00781
| INSP-Final Inspection | 1/22/2015 | 1/27/2015 | 1/27/2015 10:37:44 AM | A | FAIL |
|
|
Manual pull stations need relocated as indicated per the project scope and plan review comment #19, provide knox box per review note #9.
|
BLD14-03137
| FIRE-Final Inspection | 1/26/2015 | 1/27/2015 | 1/27/2015 9:50:17 AM | A | PASS |
|
|
Life safety inspection completed satisfactory. No signature card available on site.
|