Inspections for the day of: Tuesday, January 27, 2015.
Number of inspections: 23
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-01040 Tracking Control1/26/20151/27/20151/27/2015 4:20:07 PMPCANC
rescheduled for 1/28
ESC14-00106 General Inspection1/27/20151/27/20151/27/2015 4:11:32 PM PASS
ESC14-00360 General Inspection1/27/20151/27/20151/27/2015 3:56:41 PM PART
Driveway was poured earlier today, no washout piles found on site.

Corrective action needed:

- gutter on Stone Point needs to be swept along length of property as well as the accumulated dirt from site down the hill on Starcrest..
ESC12-00842 Tracking Control1/27/20151/27/20151/27/2015 3:34:25 PMPFAIL
Private road through Trailwinds is full of loose dirt, sawdust, and other materials that requires cleaning and sweeping ASAP.

ACHD street sweeper did clean Wright while I was onsite.

Corrections:
1. Clean up all loose dirt on private drive and Wright.
2. Designate staging and work area to contain/consolidate sawdust and other
3. Check DI filter bags and maintain as necessary.

Notice of corrections issued verbally to developer/RP Cameron Jayo.
ESC14-01192 Site Preparation1/26/20151/27/20151/27/2015 2:43:59 PMAPASS
Shane Phone #: ###-####



Permit posted. Somerset Village has BMPs installed to contain sediment onsite as well as filter bags installed on all downstream DIs. Additional wattle was installed to contain excavated material. Gravel bag sediment stopper installed in gutter.

Approved for construction.
ESC14-00397 Aging Inspection1/27/20151/27/20151/27/2015 12:33:02 PM PASS
Tennis courts are now installed and park areas that were disturbed have been stabilized with vegetation and landscaping. No construction materials or loose sediment on site. Permit finaled.
ESC14-00397 DOC - Permit Finaled1/27/20151/27/20151/27/2015 12:32:46 PMPPASS
ESC14-00407 Aging Inspection1/27/20151/27/20151/27/2015 12:23:24 PM PASS
Project complete. All materials cleaned and the disturbed portion of yard has been re-sodded. ESC permit condition met and permit finaled.
ESC14-00407 DOC - Permit Finaled1/27/20151/27/20151/27/2015 12:20:36 PMPPASS
ESC13-00755 Tracking Control1/27/20151/27/20151/27/2015 12:15:15 PMPFAIL
Significant trackout onto Council Springs and extending west on Warm Springs. Paved access road through Terraces is also very muddy.

Corrections:
1. Sweep up trackout on Council Springs, Warm Springs and roundabout on Lysted.
2. Scarify or add more rock to the laydown yard construction entrance.
3. Re-implement adminstrative controls within site in regards to delivery and material unloading to reduce trackout.
ESC14-01073 Site Preparation1/26/20151/27/20151/27/2015 12:00:34 PMAPASS
Clint Phone #: ###-####

Approved. Permit posted. Current projects in complianced. Approved to start new townhome.
ESC14-01157 BMP Violation1/27/20151/27/20151/27/2015 11:56:26 AMPFAIL
Mud on streets, sidewalks, and gutters. Uncontained trash and materials. No permit visibly posted.

Verbal CN issued to Berkely Homes RP Keith. Compliance date is 1/29 (thursday PM). He stated trash will be picked up today and he will sweep and clean today and tomorrow.
ESC14-01191 Site Preparation1/26/20151/27/20151/27/2015 11:37:07 AMAPASS
Christy Phone #: ###-####

Permit posted. No excavation started yet. Site is between two existing homes so access will be from alley and Snow Bird.

Approved for construction - Wood Bros/Mansions & Makeovers sites in Sunnyridge are currently in good shape.
ESC14-01137 BMP Violation1/27/20151/27/20151/27/2015 11:26:09 AMAFAIL
Final warning to Hayden Homes RP to clean up this site. A sweeper did clean the street but the gutter and sidewalks are a mess and sub-contractors are driving in the mud between sidewalk and curb.

This site and adjacent project ESC14-01134 need to be in compliance by Thursday or a SWO/hold on trade inspections will be placed on the two homes.
ESC14-00168 Aging Inspection1/27/20151/27/20151/27/2015 10:24:42 AM PASS
Home is complete, landscaped and occupied.

Permit conditions satisifed. All homes on Winston are now complete.
ESC14-00168 DOC - Permit Finaled1/27/20151/27/20151/27/2015 10:23:59 AMPPASS
ESC15-00030 Site Preparation1/26/20151/27/20151/27/2015 10:23:11 AMAPASS
Chris Phone #: ###-####

Onsite meeting with RP/GC Chris of Hornet Construction. Asphalt to be cut between power poles. Sheet flow goes to grassy vegetated area. No MS4 infrastructure on Gem Street. Home will be moved and then set down next to where foundation will be excavated.

Permit will be posted in the window on the house. Approved for construction
ESC13-00655 General Inspection1/27/20151/27/20151/27/2015 9:43:37 AMAPASS
Correction request/notice from last Tuesday 1/20. All streets, parking lots, and gutters around Aberdeen Square were swept on Friday. No new trackout or issues. WIP. Approved.
ESC14-00563 DOC - Permit Finaled1/27/20151/27/20151/27/2015 9:38:58 AMPPASS
Aberdeen 4-plex is complete and surrounding area landscaped with parking lot swept last Friday. Exterior painting is currently being completed. ESC permit conditions satisfied, many other open permits and ongoing work at Aberdeen Square.
ESC14-00746 General Inspection1/27/20151/27/20151/27/2015 9:33:13 AM PASS
WIP. Permit posted, work and sediment staying within Simplot Plant Science compound. No discharges or trackout to Irving.

Some minor trackout at the construction entrance on Phillipi needs sweeping during regular cleanup activities.
ESC14-00563 General Inspection1/27/20151/27/20151/27/2015 8:59:55 AM PASS
ESC14-00513 General Inspection1/27/20151/27/20151/27/2015 8:45:00 AM PASS
Boise International Market TI is complete. No distured areas or material stockpiles. Market is open for business. ESC permit conditions satisfied.
ESC14-00513 DOC - Permit Finaled1/27/20151/27/20151/27/2015 8:43:30 AMPPASS