BLD15-02651
| DOC - Permit Finaled | 1/27/2016 | 1/27/2016 | 1/27/2016 3:47:36 PM | P | PASS |
|
|
|
BLD15-02169
| BLD-Final | 1/26/2016 | 1/27/2016 | 1/27/2016 3:46:41 PM | P | NR |
|
|
Josh Phone #: ###-####. Adress not posted, exterior wall weather envelope not completed. No access, but noted that spindels at stairway for guards not completed. No further inspection was completed.
|
BLD16-00051
| BLD-Final | 1/27/2016 | 1/27/2016 | 1/27/2016 3:03:43 PM | P | CANC |
|
|
Call to meet on job site. Phone #: ###-#### Inspection requested via web by Shannon Wall. . Per Larry, this should have been scheduled for 1/28 in the am
|
BLD15-00240
| BLD-Final | 1/27/2016 | 1/27/2016 | 1/27/2016 2:16:40 PM | P | PART |
|
|
Pat Phone #: ###-####. Will be ok for perm occ. once zoning signs perm.
|
BLD15-03399
| BLD-Footing | 1/27/2016 | 1/27/2016 | 1/27/2016 1:37:23 PM | P | PASS |
|
|
Jim Phone #: ###-####
|
BLD15-03500
| BLD-Conference | 1/27/2016 | 1/27/2016 | 1/27/2016 11:34:40 AM | A | DEFR |
|
|
Per structural engineer for the project David Sansotta, no special inspections required for the 1500 psf minimum bearing pressures soil however he requested that the city inspector verify the conditions are acceptable. Footings are excavated and the soil appears to meet or exceed the allowable requirements. Request a conference to confer with inspector. Call Antonio Carone with questions. Phone #: ###-#### Inspection requested via web by Antonio Carone. No geo-tech report for project. Project site has had 2ft. to 3ft. of uncontrolled fill from previous construction to the south. Also noted construction debries within the building pad site and excavated footings. Noted to contractor that a sub grade inspection would be required by a geo-tech engineer.
|
BLD16-00125
| BLD-Framing/Rough-in | 1/27/2016 | 1/27/2016 | 1/27/2016 11:30:27 AM | P | PASS |
|
|
Mike Phone #: ###-####,, ok to insulate
|
BLD16-00098
| BLD-Framing/Rough-in | 1/27/2016 | 1/27/2016 | 1/27/2016 11:29:13 AM | P | PASS |
|
|
Jon Phone #: ###-####,, ok to insulate
|
BLD15-04250
| BLD-Framing/Rough-in | 1/26/2016 | 1/27/2016 | 1/27/2016 11:10:13 AM | A | PASS |
|
|
Mike Phone #: ###-####
|
BLD15-00935
| BLD-Final | 1/26/2016 | 1/27/2016 | 1/27/2016 10:17:51 AM | A | FAIL |
|
|
Sergey Phone #: ###-####. Provide the required energy cert and post. Provide the blower door test results or the 3rd. party inspection air seal report. Provide 2% slope away from foundation for drainage. Correction notice posted.
|
BLD15-04181
| BLD-Final | 1/26/2016 | 1/27/2016 | 1/27/2016 9:34:14 AM | A | NR |
|
|
Calvin Phone #: ###-####. Plumbing final has failed.
|
BLD15-04336
| BLD-Conference | 1/26/2016 | 1/27/2016 | 1/27/2016 9:27:54 AM | A | DONE |
|
|
Scott Phone #: ###-####
|