Inspections for the day of: Friday, January 27, 2017.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE16-01134 Electrical Rough-In1/27/20171/27/20171/27/2017 1:10:34 PMPPASS
We are requesting a rough-in inspection for level 4 for this afternoon. Our contact is Bobby @ ###-####. Thank you. Phone #: ###-#### Inspection requested via web by Clint Tate
4th floor rooms only exept ADA and south west rooms and 10th floor stair 2 ok pour
ELE17-00037 Final1/26/20171/27/20171/27/2017 12:33:07 PMPCANC
Check ceilng fan boxes on bld 2@3
NO final just Rough-in
ELE17-00037 Electrical Rough-In1/27/20171/27/20171/27/2017 12:32:57 PMPPASS
Check ceilng fan boxes on bld 2@3
Verified u/l listing fan boxes being used to support paddle fans
ELE16-04108 Conference1/27/20171/27/20171/27/2017 12:23:43 PMPDONE
Discussed service change and relocation of CT can, overcurrent device and main discconect will be on outsideof building due to unfused conductors ran inside building and not encased in concrete
ELE16-02693 Conference1/26/20171/27/20171/27/2017 10:25:26 AMADONE
Discuss rough in under concourse. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Discussed rough-in requirements when over pass is framed due to lights not in on time, able to cut in after framing and will take pictures and leave 2 or 3 to look at
ELE16-02626 Final1/26/20171/27/20171/27/2017 9:06:50 AMAPASS
Access is 2173 at Lockbox at the front entry. Phone #: ###-#### Inspection requested via web by Paula Gratiot
Correctgions fixed final ok