Inspections for the day of: Friday, January 27, 2017.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD16-02724 BLD-Final1/25/20171/27/20171/27/2017 4:25:27 PMPNR
Blake Phone #: ###-####. Needs Mech. final.
BLD16-03884 BLD-Framing/Rough-in1/27/20171/27/20171/27/2017 3:52:00 PMPFAIL
thi Phone #: ###-####. Fire block tall by stairs at 10ft.. Fireblock mech. shaft upstairs at ceiling level. Provide adequate bearing on D02 truss upstairs. Provide header on interior wall upstairs at truss bearing. Correction notice posted. Ok to insualte.
BLD16-02870 BLD-Energy code compliance1/27/20171/27/20171/27/2017 2:39:52 PMPPASS
BLD16-02880 BLD-Footing1/26/20171/27/20171/27/2017 1:59:08 PMPPASS
Dane Phone #: ###-####
BLD16-04036 BLD-Energy code compliance1/27/20171/27/20171/27/2017 1:43:22 PMPPASS
Duane Phone #: ###-####
BLD16-04333 BLD-Framing/Rough-in1/26/20171/27/20171/27/2017 1:29:34 PMPPASS
Phone #: 2085156235 >> Inspection requested via mobile web by Brian Rodriguez
BLD15-04486 BLD-Foundation1/26/20171/27/20171/27/2017 10:51:57 AMAPEND
Phone #: ###-#### Inspection requested via web by Michael West. Non load bearing masonry screen wall, ok pending special inspection. Work in progress.
BLD16-03203 BLD-Wall Bracing1/26/20171/27/20171/27/2017 10:02:49 AMAPASS
Phone #: ###-#### Inspection requested via web by Kyle Seick. Exterior shear only.
BLD16-03231 BLD-Final1/26/20171/27/20171/27/2017 9:39:56 AMAPASS
larry Phone #: ###-####
BLD16-03231 DOC - Permit Finaled1/27/20171/27/20171/27/2017 9:39:43 AMPPASS
MIS16-00282 BLD-Conference1/10/20171/27/20171/27/2017 9:10:25 AMADONE
All paperwok needed has been completed. Building tenant has noted that he needs to get money for permit fees.
BLD16-02020 BLD-Conference1/25/20171/27/20171/27/2017 9:09:08 AMADONE
Bill Phone #: ###-#### reviewed all special inspection reports to date for concrete, reinforcement, soils and geo-grid. Also discussed bolting inspection moving foward.
BLD16-02870 BLD-Energy code compliance1/26/20171/27/20171/27/2017 8:53:05 AMANR
Wall insulation inspection. Late morning inspection, if at all possible. Thanks, Phone #: ###-#### Inspection requested via web by Chris Palmer