Inspections for the day of: Friday, January 27, 2017.
Number of inspections: 12
Percentage of inspections complete: 75 %
Percentage of inspections not complete: 25 %
Contact Information
InspectorMelissa Jannusch
TitleEROSION INSPECTOR
Phone #789-3996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00142 General Inspection1/20/20171/20/2017   
ESC16-00225 General Inspection1/20/20171/20/2017   
ESC16-00603 General Inspection1/20/20171/20/2017   
ESC16-00815 Aging Inspection1/27/20171/27/20172/1/2017 1:58:10 PM PASS
Building finaled. No trackout. No trash remaining. Soil appears to be stabilized. Okay to final
ESC16-00751 Aging Inspection1/27/20171/27/20172/1/2017 1:49:40 PM PASS
Snow covered conditions. No corrections.
ESC16-00864 Aging Inspection1/27/20171/27/20172/1/2017 1:42:57 PM PASS
Snow cover conditions. Could not see stormwater hotline sign. Left a message with owner/RP Kelly and let him know I left a sign on site for him to fill out and post. No trackout. No trash.
ESC15-00731 General Inspection1/27/20171/27/20172/1/2017 11:00:12 AM PASS
Snow covered conditions. No corrections. Sign is posted SWPPP inspections are up to date.
ESC16-00712 General Inspection1/27/20171/27/20171/30/2017 4:25:39 PM PASS
Addition is finished. No trash, track out, or dirt on site.
ESC16-00499 General Inspection1/27/20171/27/20171/30/2017 4:06:57 PM PASS
Snow covered conditions. Building appears to be nearly complete. No track out trash contained. Have started work on lot next door will continue once conditions improve.
ESC15-00976 General Inspection1/27/20171/27/20171/30/2017 2:11:05 PM PASS
Vertical WIP. Sign posted. No track out. Waste containment beginning to overflow. Check that the container has been emptied during the next inspection. Some scattered building materials, but all contained onsite. Some areas still snow covered.
ESC16-00700 Site Final1/27/20171/27/20171/27/2017 11:17:25 AMPPASS
Okay to final
ESC16-01560 General Inspection1/27/20171/27/20171/27/2017 10:39:21 AMPPASS
Dewatering system okay. Clean water discharging into pond. Water in sedimentations ponds in infiltrating. Slight amount of scum on water in swale but not much. Safety fence placed between sedimentation pond and greenbelt. Will turn on stationary pump on Sunday.
Should run clear.

The next utility dewatering will start next Monday. Planning to sheet flow water and retain it on site within the berm. Have already started construction of berm. Scheduled inspection to check on set up before dewater begins.