BLD19-00526
| BLD-Wall Bracing | 1/27/2020 | 1/27/2020 | 1/27/2020 3:44:57 PM | P | PART |
|
|
Shear inspection of exterior panels on bldg A. Phone #: ###-#### Inspection requested via web by Travis Blackburn//need to add nails in areas discussed at area 4//need to add hot dip galvanized nails at PT//
|
BLD19-03357
| BLD-Other | 1/27/2020 | 1/27/2020 | 1/27/2020 3:21:57 PM | P | NR |
|
|
Inspection for fire rated soffits on the west side of home. Phone #: ###-#### Inspection requested via web by Alex Macdoanld//needs soffits installed//overhang needs cut back to meet the 2 feet min setback for overhangs per the plans//
|
BLD18-01882
| BLD-Final | 1/27/2020 | 1/27/2020 | 1/27/2020 3:20:15 PM | P | PASS |
|
|
need passing final inspection to close out permit please//final was complete pending other required inspections//
|
BLD19-03493
| BLD-Final | 1/24/2020 | 1/27/2020 | 1/27/2020 3:19:36 PM | P | NR |
|
|
marcus Phone #: ###-####//needs fire life safety//had a phone conference to discuss other inspections noted,, advised to have electrical and mechanical removed from permit//
|
BLD19-03015
| BLD-Final | 1/24/2020 | 1/27/2020 | 1/27/2020 1:02:44 PM | P | PASS |
|
|
I''m available anytime after 11:00. Phone #: ###-#### Inspection requested via web by Gary Betts//trades finals complete//structure complete per plans and engineering--revised engineering for lateral bolts reviewed onsite from engineer//
|
BLD19-03015
| DOC - Permit Finaled | 1/27/2020 | 1/27/2020 | 1/27/2020 1:01:40 PM | P | PASS |
|
|
|
BLD19-02895
| BLD-Final | 1/27/2020 | 1/27/2020 | 1/27/2020 12:05:05 PM | P | PART |
|
|
Daniel Phone #: ###-####//still needs address # posted//electrical outlet near side door needs cover//steback issue ok per zoning//
|
BLD19-03422
| BLD-Foundation | 1/27/2020 | 1/27/2020 | 1/27/2020 11:17:49 AM | P | DEFR |
|
|
Footer inspection Phone #: ###-#### Inspection requested via web by John Cloninger//defer to specials//
|
BLD19-04116
| BLD-Framing/Rough-in | 1/27/2020 | 1/27/2020 | 1/27/2020 11:04:18 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Joel Hirtle//not all corrections were completed//discussed adding bearing under pop out on 2nd floor//
|
BLD20-00097
| BLD-Foundation | 1/24/2020 | 1/27/2020 | 1/27/2020 11:02:27 AM | A | PART |
|
|
pouring at 12:45 pm- Mark Phone #: ###-####//WIP//
|
BLD19-04318
| BLD-Final | 1/23/2020 | 1/27/2020 | 1/27/2020 10:43:20 AM | A | NR |
|
|
Russel Phone #: ###-####2//need to add smoke CO at 1st floor//
|
MIS19-00081