BLD01-02064
| BLD-Framing/Rough-in | 1/24/2002 | 1/28/2002 | 1/28/2002 12:00:00 AM | A | PART |
|
|
###-####. Exterior shear. 1/28/2002 11:02:36 AM
|
BLD01-03284
| BLD-Final | 1/25/2002 | 1/28/2002 | 1/28/2002 12:00:00 AM | A | PART |
|
|
###-#### JANIS. Ok pending fire/life safety./ 1/28/2002 10:08:54 AM
|
BLD01-00737
| BLD-Framing/Rough-in | 1/25/2002 | 1/28/2002 | 1/28/2002 12:00:00 AM | A | PART |
|
|
###-#### n 1/28/2002 11:06:36 AM Went over roof trusses at 4 th floor there are correction to be made .a. w 1/28/2002 1:23:23 PM
|
BLD01-03268
| BLD-Final | 1/28/2002 | 1/28/2002 | 1/28/2002 12:00:00 AM | A | NH |
|
|
###-#### window replacmentm 1/28/2002 1:36:09 PM
|
BLD01-02967
| BLD-Framing/Rough-in | 1/28/2002 | 1/28/2002 | 1/28/2002 12:00:00 AM | P | PART |
|
|
celling grid john ###-####needs addnl perimeter wires 1/29/2002 1:31:57 PM
|
BLD01-03169
| BLD-Conference | 1/28/2002 | 1/28/2002 | 1/28/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 10:11:23. Contact: ###-####.new soffit detail ok. 1/29/2002 1:32:14 PM
|