PLM03-02946
| Final | 1/27/2004 | 1/28/2004 | 1/28/2004 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 1/27/2004 at 12:55:43 PM. Contact: (208) . please call 1st ###-#### bill mccombs final ok 1/28/2004 9:21:44 AM
|
PLM03-03663
| Final | 1/28/2004 | 1/28/2004 | 1/28/2004 12:00:00 AM | A | CANC |
|
|
|
PLM03-03662
| Final | 1/28/2004 | 1/28/2004 | 1/28/2004 12:00:00 AM | A | PASS |
|
|
final ok 1/28/2004 10:37:36 AM
|
PLM04-00188
| Water and/or Sewer | 1/28/2004 | 1/28/2004 | 1/28/2004 12:00:00 AM | P | PASS |
|
|
###-#### ROB INSPECT OUT TO STUB sw final ok 1/28/2004 1:46:37 PM
|
PLM04-00110
| Plumbing Rough-in | 1/28/2004 | 1/28/2004 | 1/28/2004 12:00:00 AM | P | PART |
|
|
call 1st before insp elizabeth---###-#### or cell ###-#### water is ok with plastic over piping in ceiling, waste needs work 1/28/2004 4:16:41 PM
|
PLM04-00193
| Plumbing Rough-in | 1/28/2004 | 1/28/2004 | 1/28/2004 12:00:00 AM | P | PASS |
|
|
###-#### craig ri ok 1/28/2004 2:30:07 PM
|
PLM04-00182
| Final | 1/27/2004 | 1/28/2004 | 1/28/2004 12:00:00 AM | P | PART |
|
|
###-#### dee dee top ri ok to cover, needs t&p drain, pan drain, complete crawlspace. 1/28/2004 9:10:02 AM
|