Inspections for the day of: Monday, January 28, 2008.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD04-01836 BLD-Aging Inspection1/28/20081/28/20081/30/2008 11:35:18 AMPPART
Pending repair of EM lights at some locations, project related sprinkler permit has been set for final.
FIR07-00827 INSP-Sprinkler Rough-in1/25/20081/28/20081/29/2008 4:46:57 PMACANC
FIR07-00989 INSP-Final Inspection1/28/20081/28/20081/29/2008 10:21:44 AMPPASS
Ceilings completed, permit okay for final.
FIR07-01048 INSP-Sprinkler Rough-in1/28/20081/28/20081/28/2008 3:38:49 PMPPART
Fire sprinkler rough-in at the drop ceilings is approved for cover as noted.
FIR07-00243 INSP-Final Inspection1/24/20081/28/20081/28/2008 3:37:05 PMPFAIL
Need plan resubmittals per field inspection notes completed 6/27/07 for the dry system modifications, the paddle style waterflow switch at the dry system riser is not allowed, provide a QR head at the first floor SE storage room, need to provide a seal or lock at the ball valve to the pressure switch at the dry system trim, noted mixed response heads at three rooms on the second floor including 212 and 223, one head at room 236 is obstructed by a light fixture, noted items from the previous inspection at the 1st floor are complete, inspection concluded at this time due to time constraints.
FIR07-01047 INSP-Sprinkler Rough-in1/28/20081/28/20081/28/2008 1:35:19 PMPPART
Overhead install is approved for cover at the drop ceilings.
BLD07-01209 FIRE-Final Inspection1/28/20081/28/20081/28/2008 1:33:56 PMPPASS
Fire life safety is satisfactory, posted max. occupant load is not correct- see plan annotations and fire code review notes for the correct number (80) to be posted- verified at structural final, remaining life safety is acceptable.
FIR07-00920 INSP-Sprinkler Rough-in1/28/20081/28/20081/28/2008 1:18:15 PMPFAIL
Installation has been concealed prior to rough-in for cover request, see fire code review notes for details pertaining to field inspection requirements.
FIR07-01049 INSP-Sprinkler Rough-in1/28/20081/28/20081/28/2008 1:04:18 PMPFAIL
One area as marked on approved plans is overspaced from an adjacent wall.
FIR07-00702 INSP-Sprinkler Rough-in1/25/20081/28/20081/28/2008 11:30:59 AMAPART
Refer to annotations on plans for areas where the overhead rough-in can be covered at the drop and hard lid ceilings.
FIR07-00851 FIR-Aging Inspection1/28/20081/28/20081/28/2008 11:14:27 AM DEFR
Work is currently in progress, pending field inspection request to be scheduled 1/29 per conversation with contractor.
FIR07-00699 INSP-Final Inspection1/25/20081/28/20081/28/2008 10:26:07 AMAPASS
Fire alarm system modifications verified for compliance, permit finaled.
FIR07-00719 INSP-Final Inspection1/25/20081/28/20081/28/2008 10:24:52 AMAPASS
Corrections have been completed, fire alarm testing passed, permit finaled.
FIR08-00012 INSP-Final Inspection1/25/20081/28/20081/28/2008 10:23:41 AMAPASS
Fire sprinkler permit finaled.