Inspections for the day of: Monday, January 28, 2008.
Number of inspections: 5
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD07-02896 FIRE-Final Inspection1/28/20081/28/20081/28/2008 4:31:39 PMPFAIL
A waist high conveyor system is blocking the exit/fire dept access doors on the east wall. Also the fire extinguishers along this wall are now inaccessible. Other fire extinguishers in the middle of the building are buried in product and need relocated to where they will be accessible.
FIR07-01050 INSP-Sprinkler Rough-in1/24/20081/28/20081/28/2008 4:29:03 PMAFAIL
The piping installation is acceptable but the second floor pipe size does not match plans. I spoke to John Edes and let him know that the pipe size will need to be approved by Brian Johnson prior to cover permission being given. No piping can be covered at this point.
FIR07-00579 INSP-Sprinkler Rough-in1/25/20081/28/20081/28/2008 4:27:03 PMAPASS
The remaining piping to be inspected is the girls and boys restrooms and cafeteria. The sprinkler drops have not been installed yet either.
FIR07-01046 INSP-Sprinkler Rough-in1/25/20081/28/20081/28/2008 1:25:58 PMAPASS
The sprinkler piping is ok to cover.
FIR08-00063 INSP-Final Inspection1/25/20081/28/20081/28/2008 10:26:02 AMAPASS
Hood suppression system operated correctly.