Inspections for the day of: Wednesday, January 28, 2009.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD08-01600 FIRE-Final Inspection1/28/20091/28/20091/29/2009 10:52:04 AMPFAIL
Repair the electrical panel covers and provide latching doors as per the original fire dept correction notice. Repair the existing exit sign at the east bar area. Provide panic hardware on both doors at teh stir enclosure as discussed. Provide an occupant load sign of 60 for the sports bar area. Provide the fire retardant as per the original fire dept correction notice. Rewire the southwest exit sign to unswitched power.
BLD08-01846 FIRE-Final Inspection1/28/20091/28/20091/28/2009 4:19:43 PMPPASS
Life safety passed
FIR08-00750 INSP-Alarm Testing1/27/20091/28/20091/28/2009 4:18:54 PMPFAIL
Bruce provided me with a set of as-built plans upon arrival. These as-built plans do not reflect the actual installation and the installation is not code compliant in several respect. A resubmittal for plan review is required, which is to include as built modifications and revised NAC circuit calculations. I annotated the corrections needed in red ink on the as builts for their reference. These corrections include strobes that are overspaced off of walls in several areas, and an area in the Mail Room that has no strobe coverage at all but is required due to a full height wall that was not shown on the plans; a strobe that was installed in the Mail Room which was not shown on the as-builts, an additional pull station which is required at the north exit door that is not installed or shown on the approved plans, the fire alarm panel which is not located as shown on the city approved plans but is now located in a room completely across the building; an additional fire sprinkler riser with a PIV tamper switch, two backflow tamper switches and a flow switch which has been connected to the new fire alarm system which was not shown on the city approved fire alarm plans. Also per the scope of work there are no hvac smoke duct detectors shown but the as-builts show two hvac units with detectors and interconnection with the FACP which matches the installation. Approved resubmittals will be required prior to final inspection of this project showing all of the listed changes and any others as the inspection progresses. The items that were tested today and passed are all of the new sprinkler devices, phone lines, NAC interconnects and the two area smoke detectors. The two duct smoke detectors were not tested due to not having access to the temperature controls for the hvac units.
Also the installation has only been done for area A as shown the issued plans; area B is to be completed after relocating the occpants into area A after it has been completed and approved for occupancy; at which time the existing Simplex will be removed and devices connected to the new FACP. This Phasing was not indicated on the Alarm Application but will be acceptable as long as alarm monitoring is not interrupted.
FIR08-00626 INSP-Sprinkler Rough-in/Hydro1/28/20091/28/20091/28/2009 2:22:30 PMPPASS
The underground and overhead hydro tests passed.
FIR07-00461 INSP-Final Inspection1/26/20091/28/20091/28/2009 2:10:31 PMPPASS
Permit finaled
FIR08-00612 INSP-Final Inspection1/27/20091/28/20091/28/2009 2:09:41 PMPCANC
The resubmitted drawings have not been approved yet.
FIR08-00760 INSP-Sprinkler Rough-in/Hydro1/27/20091/28/20091/28/2009 2:06:20 PMAPASS
Per Scott the plans and hydraulic calculations are being resubmitted for 18'x18' spacing in the Recreation Room. Based on this conversation the sprinkler piping is ok to cover in this room. If the hydraulic calculations don't work additional heads will need to be added as per the original approved plans at the contractors expense.
BLD07-03134 FIRE-Final Inspection1/27/20091/28/20091/28/2009 11:41:50 AMPCANC
fire life safety Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD08-00594 FIRE-Final Inspection1/27/20091/28/20091/28/2009 11:41:47 AMPCANC
fire life safety Phone #: ###-#### Internet Inspection Request from: Jessica Noland Inspection cancelled from web by: Jessica Noland
BLD08-02541 FIRE-Conference1/27/20091/28/20091/28/2009 10:04:04 AMADONE
I went over the smoke evacuation system michael. I stated that my job was to verify function and that this system is to be engineered by the mall. Phone #: ###-####
FIR09-00064 INSP-Final Inspection1/27/20091/28/20091/28/2009 10:02:28 AMPPASS
Permit finaled
FIR08-00410 INSP-Final Inspection1/28/20091/28/20091/28/2009 10:01:50 AMPPASS
Permit finaled
FIR09-00062 INSP-Final Inspection1/28/20091/28/20091/28/2009 9:55:16 AMPPASS
Permit finaled
FIR08-00491 INSP-Sprinkler Rough-in1/27/20091/28/20091/28/2009 8:59:16 AMAPASS
See the city approved plans for the sprinkler piping on the first floor, at the entry lobby, that can be covered. It has todays date 1/28/2009.
BLD08-00943 FIRE-Final Inspection1/27/20091/28/20091/28/2009 8:22:53 AMAPASS
Life safety passed
FIR08-00629 INSP-Final Inspection1/28/20091/28/20091/28/2009 8:22:11 AMPPASS
permit finaled
FIR08-00708 INSP-Final Inspection1/27/20091/28/20091/28/2009 7:58:37 AMAPASS
Permit finaled
BLD07-03167 FIRE-Final Inspection1/27/20091/28/20091/28/2009 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 1/27/2009 at 3:55:33 PM. Contact: ###-####.
BLD08-01007 FIRE-Final Inspection1/27/20091/28/20091/27/2009 10:25:10 PMAPASS
Life safety passed.