BLD10-02437
| BLD-Aging Inspection | 1/28/2013 | 1/28/2013 | 1/29/2013 8:04:42 AM | | CANC |
|
|
|
BLD12-01911
| BLD-Energy code compliance | 1/28/2013 | 1/28/2013 | 1/28/2013 4:52:31 PM | P | PART |
|
|
pat Phone #: ###-#### Insulation OK........Need to see layers of gyp on lid.
|
MIS13-00016
| BLD-Conference | 1/24/2013 | 1/28/2013 | 1/28/2013 2:04:09 PM | A | NH |
|
|
Check back ........ No one at home ...no one working. Got ahold of owner (Steve) he says he will be out of town til the 10th of Feb. I told him I would schedule an appt. with him at the house so I can determine if a Bldg permit is required. I looked in the window and appears to be floor covering work and painting.
|
BLD12-00551
| BLD-Final | 1/25/2013 | 1/28/2013 | 1/28/2013 1:51:20 PM | A | NR |
|
|
Hey Jim, can you call me when you are on your way. Thanks. Jesse Phone #: ###-#### >> Inspection requested via web by Jesse Ferrer Walked through Bldg with Jesse.....made list of requirements needed to obtain Cert of Occ.
|