BLD12-01330
| BLD-Concrete | 1/28/2013 | 1/28/2013 | 1/30/2013 6:56:20 AM | A | CANC |
|
|
core wall placement Phone #: ###-#### >> Inspection requested via web by Brian Murphy
|
GCB12-00142
| GCB-Shearwall | 1/28/2013 | 1/28/2013 | 1/29/2013 6:18:31 AM | P | FAIL |
|
|
Gary @ ###-#### Gated Community - Call for Access needs to use nails or get a stapel equl from engineer also need engineering for shear panel they cut a door in.
|
GCB13-00007
| GCB-Final | 1/28/2013 | 1/28/2013 | 1/29/2013 6:16:08 AM | P | PASS |
|
|
Lee @ ###-####
|
GCB13-00002
| GCB-Fndatn/slab ins/fld vent | 1/25/2013 | 1/28/2013 | 1/28/2013 2:31:10 PM | P | PASS |
|
|
Chris @ ###-#### Late AM Inspection Call in advance
|
BLD12-02269
| BLD-Wall Bracing | 1/25/2013 | 1/28/2013 | 1/28/2013 11:08:00 AM | A | NR |
|
|
joey Phone #: ###-####
|
BLD12-02933
| BLD-Framing/Rough-in | 1/28/2013 | 1/28/2013 | 1/28/2013 11:06:44 AM | A | PART |
|
|
Raul Phone #: ###-#### c/n on site ok to insulate
|
BLD12-03137
| BLD-Wall Bracing | 1/22/2013 | 1/28/2013 | 1/24/2013 2:08:50 PM | A | CANC |
|
|
This should be lot 17 block 2. There are two lot 16 block 2''s in the system. Phone #: ###-#### >> Inspection requested via web by Braxton Hansen Inspection cancelled from web by: Braxton Hansen
|