Inspections for the day of: Tuesday, January 28, 2014.
Number of inspections: 14
Percentage of inspections complete: 93 %
Percentage of inspections not complete: 7 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-00544 General Inspection1/21/20141/21/2014   
BLD10-01983 BLD-Aging Inspection1/28/20141/28/20141/29/2014 7:42:44 AM CANC
BLD13-02515 BLD-Final1/27/20141/28/20141/28/2014 4:17:36 PMPNR
bob Phone #: ###-####. Still needs mech. final. All life sfaety ok, final ok. Contracted noted added electrical work not yet completed. Will call back for final when done.
BLD13-02071 BLD-Framing/Rough-in1/28/20141/28/20141/28/2014 3:02:09 PMPPASS
richard Phone #: ###-####. Phase 2 interior steel stud framed walls at north east portion of building and front column at main door. All screws were removed and and kickers added.
BLD14-00162 BLD-Framing/Rough-in1/27/20141/28/20141/28/2014 2:27:37 PMPFAIL
Brad Phone #: ###-####. Provide the 3/8x5 inch lags on rim to exterior wall connections and also need mech. rough in inspection. ok to insulate after mech. rough in inspection.
ESC13-01215 Random Inspection1/28/20141/28/20141/28/2014 1:43:04 PMPPASS
BLD13-03364 BLD-Footing1/28/20141/28/20141/28/2014 1:42:47 PMPPASS
Chad Phone #: ###-####. Interior thickend footing.
ESC13-01213 Random Inspection1/28/20141/28/20141/28/2014 1:42:13 PMPPASS
BLD13-03362 BLD-Footing1/28/20141/28/20141/28/2014 1:41:54 PMPPASS
Chad Phone #: ###-####. Interior thickend footing.
ESC13-00762 General Inspection1/28/20141/28/20141/28/2014 10:12:06 AMAPASS
BLD13-02055 BLD-Wall cover1/27/20141/28/20141/28/2014 10:11:44 AMAPASS
Drywall fastening at shear and firewalls Phone #: ###-#### >> Inspection requested via web by Brian Stark
BLD13-02937 BLD-Final1/27/20141/28/20141/28/2014 9:58:13 AMAPASS
Cody Phone #: ###-####
BLD13-02937 DOC - Permit Finaled1/28/20141/28/20141/28/2014 9:57:56 AMPPASS
BLD13-02071 BLD-Framing/Rough-in1/27/20141/28/20141/28/2014 9:07:59 AMAFAIL
phase 2 - Richard Phone #: ###-####. Rermove screws from grid to top plate and install kickers to structure above.