Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GCE14-00207 GCE-Rough-In1/28/20151/28/20151/28/2015 4:11:48 PMPDONE
Kevin ###-#### - INSPECTION IS FOR A CONFERENCE.
Inspection request name "preliminary conference" is not a valid inspection and is not received by PDS Online. Discuss with electrical contractor NEC requirements for service feeders and switches installed in damp locations.
ELE14-03433 Final1/28/20151/28/20151/28/2015 4:05:44 PMPPASS
Phone #: ###-#### Inspection requested via web by Ben Archibald final ok
ELE15-00215 Final1/28/20151/28/20151/28/2015 1:47:14 PMPNR
under slab Phone #: ###-#### Inspection requested via web by John Edwards not ready for final at this time
ELE15-00215 Electrical Rough-In1/28/20151/28/20151/28/2015 1:45:48 PMPPASS
under slab Phone #: ###-#### Inspection requested via web by John Edwards rough-in ok cover conduits under concrete
ELE15-00205 Electrical Rough-In1/27/20151/28/20151/28/2015 1:29:53 PMAPASS
Wall rough-in inspection please. Please call ahead of arriving to Justin Metcalf ###-####. Thank you so much and have a great day! Phone #: ###-#### Inspection requested via web by Laura Longshaw rough-in ok cover walls only