ELE17-00643
| Final | 1/25/2019 | 1/28/2019 | 1/28/2019 2:24:59 PM | P | PASS |
|
|
call for access- Bob Phone #: ###-#### Ok final. Grd screw installed in furnace disc switch. A/C brkr downsized to manu requirements.
|
ELE18-04635
| Final | 1/28/2019 | 1/28/2019 | 1/28/2019 12:28:38 PM | P | PASS |
|
|
Jerry Phone #: ###-#### Ok final. Panel labeled, intersystem installed.
|
ELE18-04755
| Final | 1/24/2019 | 1/28/2019 | 1/28/2019 10:28:16 AM | A | PASS |
|
|
Joseph Phone #: ###-#### Ok final. Correction made, GFI recept installed.
|
ELE17-03370
| Electrical Rough-In | 1/25/2019 | 1/28/2019 | 1/28/2019 10:04:21 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover SW stairwell. Scaffolding was set, couldnt see full stairwell. Contractor confirmed what was done in locations.
|
ELE18-01933
| Electrical Rough-In | 1/26/2019 | 1/28/2019 | 1/28/2019 9:42:56 AM | A | PASS |
|
|
I added 20 cans, circuits for dishwasher, disposal, and water heater code for lock box out front is 2013 thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Ok cover.
|
ELE19-00322
| Electrical Rough-In | 1/25/2019 | 1/28/2019 | 1/28/2019 9:04:46 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok cover 2 outlets S side of office.
|