Inspections for the day of: Monday, January 28, 2019.
Number of inspections: 6
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-00643 Final1/25/20191/28/20191/28/2019 2:24:59 PMPPASS
call for access- Bob Phone #: ###-#### Ok final. Grd screw installed in furnace disc switch. A/C brkr downsized to manu requirements.
ELE18-04635 Final1/28/20191/28/20191/28/2019 12:28:38 PMPPASS
Jerry Phone #: ###-#### Ok final. Panel labeled, intersystem installed.
ELE18-04755 Final1/24/20191/28/20191/28/2019 10:28:16 AMAPASS
Joseph Phone #: ###-#### Ok final. Correction made, GFI recept installed.
ELE17-03370 Electrical Rough-In1/25/20191/28/20191/28/2019 10:04:21 AMAPASS
Phone #: ###-#### Inspection requested via web by Kerri Hamilton Ok cover SW stairwell. Scaffolding was set, couldnt see full stairwell. Contractor confirmed what was done in locations.
ELE18-01933 Electrical Rough-In1/26/20191/28/20191/28/2019 9:42:56 AMAPASS
I added 20 cans, circuits for dishwasher, disposal, and water heater code for lock box out front is 2013 thanks! Phone #: ###-#### Inspection requested via web by Trevor Soesbe Ok cover.
ELE19-00322 Electrical Rough-In1/25/20191/28/20191/28/2019 9:04:46 AMAPASS
Phone #: ###-#### Inspection requested via web by Dean Gernaat Ok cover 2 outlets S side of office.