ELE14-01014
| ELE-Aging Inspection | 1/28/2020 | 1/28/2020 | 1/29/2020 5:16:01 AM | | DONE |
|
|
We have talked about this job a couple of times David. Lets see what we can do about finaling this out.
|
ELE20-00068
| Permanent Service | 1/28/2020 | 1/28/2020 | 1/28/2020 2:46:57 PM | P | PASS |
|
|
upgrade in progress Phone #: ###-#### Inspection requested via web by Ashley Rasmussen p/s o/h rec ok
|
ELE20-00068
| Electrical Rough-In | 1/23/2020 | 1/28/2020 | 1/28/2020 2:21:11 PM | P | PASS |
|
|
There is also an upgrade happening here. Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Items UL listed
|
ELE19-04309
| Electrical Rough-In | 1/28/2020 | 1/28/2020 | 1/28/2020 12:31:01 PM | P | CANC |
|
|
Carl Phone #: ###-#### Made this a final, and cancelled RI. RI was called in twice. Spoke to contractor, and he said tomorrow morning for RI would be better.
|
ELE20-00235
| Final | 1/28/2020 | 1/28/2020 | 1/28/2020 12:06:39 PM | P | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Line side connection requires a minimum 60a disconnect. It is considered a service disconnecting means. 230.79 (D)
|
ELE20-00256
| Electrical Rough-In | 1/27/2020 | 1/28/2020 | 1/28/2020 11:59:43 AM | A | PASS |
|
|
Requesting An Underground And Bonding Inspection. Please Contact Louis Keller With Any Questions At ###-####. Phone #: ###-#### Inspection requested via web by Louis Keller Ok cover swim spa. 4 corners bonded, motor location. 1 LV light on NE corner. Pool vault to be done later, a long with more grd work that Lewis said will be done later.
|
ELE17-01606
| Final | 1/28/2020 | 1/28/2020 | 1/28/2020 10:42:36 AM | P | PASS |
|
|
Ok final. Verified 2 grd rods and panel change with bond screw installed on first inspection for reconnect. No other work was done as per conversation with contractor. This is to close out permit.
|
ELE19-03642
| Final | 1/27/2020 | 1/28/2020 | 1/28/2020 10:10:01 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Ok final. Pop up added to left of range.
|
ELE18-02261
| Final | 1/27/2020 | 1/28/2020 | 1/28/2020 9:19:02 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Jim Williams Ok final. Temp pole never finaled out the first time.
|
ELE19-04838
| Electrical Rough-In | 1/27/2020 | 1/28/2020 | 1/28/2020 8:27:06 AM | A | CANC |
|
|
Look at flat roof discussed on previous consultation. Phone #: ###-#### >> Inspection requested via web by mike brown Inspection cancelled from web by: Bonnie Page
|