Inspections for the day of: Tuesday, January 28, 2020.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMark Moncarr
TitleELE-INSPECTOR
Phone #685-9023
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE14-01014 ELE-Aging Inspection1/28/20201/28/20201/29/2020 5:16:01 AM DONE
We have talked about this job a couple of times David. Lets see what we can do about finaling this out.
ELE20-00068 Permanent Service1/28/20201/28/20201/28/2020 2:46:57 PMPPASS
upgrade in progress Phone #: ###-#### Inspection requested via web by Ashley Rasmussen p/s o/h rec ok
ELE20-00068 Electrical Rough-In1/23/20201/28/20201/28/2020 2:21:11 PMPPASS
There is also an upgrade happening here. Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Items UL listed
ELE19-04309 Electrical Rough-In1/28/20201/28/20201/28/2020 12:31:01 PMPCANC
Carl Phone #: ###-#### Made this a final, and cancelled RI. RI was called in twice. Spoke to contractor, and he said tomorrow morning for RI would be better.
ELE20-00235 Final1/28/20201/28/20201/28/2020 12:06:39 PMPFAIL
Phone #: ###-#### Inspection requested via web by Ashley Rasmussen Line side connection requires a minimum 60a disconnect. It is considered a service disconnecting means. 230.79 (D)
ELE20-00256 Electrical Rough-In1/27/20201/28/20201/28/2020 11:59:43 AMAPASS
Requesting An Underground And Bonding Inspection. Please Contact Louis Keller With Any Questions At ###-####. Phone #: ###-#### Inspection requested via web by Louis Keller Ok cover swim spa. 4 corners bonded, motor location. 1 LV light on NE corner. Pool vault to be done later, a long with more grd work that Lewis said will be done later.
ELE17-01606 Final1/28/20201/28/20201/28/2020 10:42:36 AMPPASS
Ok final. Verified 2 grd rods and panel change with bond screw installed on first inspection for reconnect. No other work was done as per conversation with contractor. This is to close out permit.
ELE19-03642 Final1/27/20201/28/20201/28/2020 10:10:01 AMAPASS
Phone #: ###-#### Inspection requested via web by TOM BICANDI Ok final. Pop up added to left of range.
ELE18-02261 Final1/27/20201/28/20201/28/2020 9:19:02 AMAPASS
Phone #: ###-#### Inspection requested via web by Jim Williams Ok final. Temp pole never finaled out the first time.
ELE19-04838 Electrical Rough-In1/27/20201/28/20201/28/2020 8:27:06 AMACANC
Look at flat roof discussed on previous consultation. Phone #: ###-#### >> Inspection requested via web by mike brown Inspection cancelled from web by: Bonnie Page