PLM96-00164
| INSP - Final | 1/29/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | | PASS |
|
|
/ / 347 - two floor drains only o/k
|
PLM96-02466
| INSP - Plumbing Rough-in | 1/29/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | | PART |
|
|
/ / 347 - north wing---all drain, waste, vent, hot, cold and return domestic water o/k
|
PLM97-00165
| INSP - Plumbing Rough-in | 1/28/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | A | PASS |
|
|
01/28/97 347 -
|
PLM96-02074
| INSP - Final | 1/28/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | A | PASS |
|
|
01/28/97 347 - w/c 2 basin 2 tub 2 sink 1 w/b 1 w/h 1
|
PLM96-02075
| INSP - Final | 1/28/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | A | PASS |
|
|
01/28/97 347 - w/c 2 basin 2 tub 1 sink 1 w/b 1 w/h 1
|
PLM96-00050
| INSP - Plumbing Rough-in | 1/29/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | P | PASS |
|
|
01/29/97 347 -
|
PLM96-00083
| INSP - Plumbing Rough-in | 1/29/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | P | FAIL |
|
|
01/29/97 347 - waste test failed
|
PLM96-03550
| PLM - Partial final | 1/29/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | P | FAIL |
|
|
01/29/97 347 - needs first kit. drain hooked up with a vent other sink not ready
|
PLM96-03675
| INSP - Final | 1/29/1997 | 1/29/1997 | 1/29/1997 12:00:00 AM | P | PASS |
|
|
01/29/97 347 - w/c 2 basin 3 tub 1 shr 1 sink 1 w/b 1 w/h 1
|