PLM01-00193
| Plumbing Rough-in | 1/29/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 07:27:25. Contact: ###-####.
|
PLM98-00931
| Storm Drains | 1/29/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 352 On 1/29/2001 2:46:02 PM
|
PLM98-00931
| Storm Drains | 1/29/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 352 On 1/29/2001 2:46:02 PM
|
PLM98-00931
| Storm Drains | 1/29/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 352 On 1/29/2001 2:46:02 PM
|