BLD01-00075
| BLD-Foundation | 1/26/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 01/26/2001 at 17:08:41. Contact: ###-####.cancelled by contractor 1/29/2001 11:21:03 AM
|
BLD00-03410
| BLD-Framing/Rough-in | 1/29/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2001 at 06:55:56. Contact: ###-####.ok to side. 1/29/2001 10:17:29 AM
|
BLD00-03598
| BLD-Framing/Rough-in | 1/29/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PASS |
|
|
shear wall bob-- ###-#### ok to side 1/29/2001 2:12:15 PM
|
BLD00-03001
| BLD-Energy code compliance | 1/29/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PASS |
|
|
don-- ###-#### energy code ok to cover 1/29/2001 1:02:18 PM
|
BLD00-03579
| BLD-Energy code compliance | 1/26/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PASS |
|
|
holton homes ###-#### ok to cover 1/29/2001 1:43:22 PM
|
BLD00-03129
| BLD-Framing/Rough-in | 1/26/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PART |
|
|
###-#### marshallc/n issued, 1) bracing needed on gable truesses, 2) Rim in crawl needs insulation, 3) Truess AG in garage needs additional nailing, 4) Draftstops needed both sides of fireplace, 1/29/2001 12:32:28 PM
|
BLD01-00154
| BLD-Footing | 1/26/2001 | 1/29/2001 | 1/29/2001 12:00:00 AM | P | PART |
|
|
Todd ###-####-setback, soil ok, rebar not installed at time of inspection, reviewed plans. 1/29/2001 2:27:13 PM
|