Inspections for the day of: Tuesday, January 29, 2002.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorCarl Dependahl
TitleBLD-COM/RES INSPECTOR
Phone #794-9492
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00512 BLD-Aging Inspection1/29/20021/29/20021/31/2002 12:00:00 AM NR
wip, 10th fl 1/31/2002 5:59:25 PM
BLD01-02226 BLD-Aging Inspection1/29/20021/29/20021/31/2002 12:00:00 AM PASS
ok 1/31/2002 5:59:57 PM
BLD01-02191 BLD-Aging Inspection1/29/20021/29/20021/31/2002 12:00:00 AM PASS
finalled 1-30 1/31/2002 8:26:06 AM
BLD01-02414 BLD-Framing/Rough-in1/28/20021/29/20021/29/2002 12:00:00 AMANR
###-#### PETE CALL FIRST PLEASE, complete roof, get other r/i's 1/29/2002 12:04:37 PM
BLD00-02375 BLD-Framing/Rough-in1/28/20021/29/20021/29/2002 12:00:00 AMAFAIL
need plans for canopy, complete firestops at int of bldg 1/30/2002 3:12:15 PM
MIS02-00017 BLD-Final1/28/20021/29/20021/29/2002 12:00:00 AMANR
ALLEN ###-####
BLD01-03031 BLD-Conference1/28/20021/29/20021/29/2002 12:00:00 AMAPASS
MIKE ###-####...need plbg,cdhd, fire, etc...install firestops at bsmt after plbg r/i. 1/29/2002 12:02:09 PM
MIS02-00010 BLD-Final1/28/20021/29/20021/29/2002 12:00:00 AMPNR
###-####; need verify fire ok 1/29/2002 6:11:48 PM
BLD01-02775 BLD-Framing/Rough-in1/28/20021/29/20021/29/2002 12:00:00 AMPPART
###-#### MIKE "tunnel" const ok, seal misc penetrations at corridor (plbg) addkickers at int walls & spacers for grid clg...ok to tile as noted. 1/29/2002 3:35:01 PM
BLD01-02145 BLD-Final1/29/20021/29/20021/29/2002 12:00:00 AMPFAIL
RUSS ###-####...fail, add landings at door(s) as shown, obtain other finals 1/29/2002 2:32:05 PM
BLD01-00882 BLD-Conference1/29/20021/29/20021/29/2002 12:00:00 AMPPASS
###-#### code req's & design service 1/29/2002 6:59:30 PM
BLD00-03361 BLD-Conference1/29/20021/29/20021/29/2002 12:00:00 AMPPART
Scheduled by Inspector: 340 On 1/29/2002 12:38:05 PM w/ Wendall...need canopy plans 1/29/2002 6:14:30 PM
BLD01-00228 BLD-Conference1/29/20021/29/20021/29/2002 12:00:00 AMPPASS
Scheduled by Inspector: 340 On 1/29/2002 2:16:08 PM w/ Stan & Wendell re c/n...keep c/n. complete all firestops, verify canopy modification approval 1/29/2002 6:16:20 PM
BLD01-02507 BLD-Conference1/29/20021/29/20021/29/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 1/29/2002 3:31:57 PM floor line penetrations ok (curtain wall) ok to drop all tiles
BLD00-01150 BLD-Conference1/29/20021/29/20021/29/2002 12:00:00 AMPPASS
Added by Inspector: 340 On 1/29/2002 3:36:06 PM w/ prop mgr, keep c/n's re upgrade