BLD01-00512
| BLD-Aging Inspection | 1/29/2002 | 1/29/2002 | 1/31/2002 12:00:00 AM | | NR |
|
|
wip, 10th fl 1/31/2002 5:59:25 PM
|
BLD01-02226
| BLD-Aging Inspection | 1/29/2002 | 1/29/2002 | 1/31/2002 12:00:00 AM | | PASS |
|
|
ok 1/31/2002 5:59:57 PM
|
BLD01-02191
| BLD-Aging Inspection | 1/29/2002 | 1/29/2002 | 1/31/2002 12:00:00 AM | | PASS |
|
|
finalled 1-30 1/31/2002 8:26:06 AM
|
BLD01-02414
| BLD-Framing/Rough-in | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | NR |
|
|
###-#### PETE CALL FIRST PLEASE, complete roof, get other r/i's 1/29/2002 12:04:37 PM
|
BLD00-02375
| BLD-Framing/Rough-in | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | FAIL |
|
|
need plans for canopy, complete firestops at int of bldg 1/30/2002 3:12:15 PM
|
MIS02-00017
| BLD-Final | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | NR |
|
|
ALLEN ###-####
|
BLD01-03031
| BLD-Conference | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
MIKE ###-####...need plbg,cdhd, fire, etc...install firestops at bsmt after plbg r/i. 1/29/2002 12:02:09 PM
|
MIS02-00010
| BLD-Final | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | NR |
|
|
###-####; need verify fire ok 1/29/2002 6:11:48 PM
|
BLD01-02775
| BLD-Framing/Rough-in | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
###-#### MIKE "tunnel" const ok, seal misc penetrations at corridor (plbg) addkickers at int walls & spacers for grid clg...ok to tile as noted. 1/29/2002 3:35:01 PM
|
BLD01-02145
| BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | FAIL |
|
|
RUSS ###-####...fail, add landings at door(s) as shown, obtain other finals 1/29/2002 2:32:05 PM
|
BLD01-00882
| BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PASS |
|
|
###-#### code req's & design service 1/29/2002 6:59:30 PM
|
BLD00-03361
| BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
Scheduled by Inspector: 340 On 1/29/2002 12:38:05 PM w/ Wendall...need canopy plans 1/29/2002 6:14:30 PM
|
BLD01-00228
| BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 340 On 1/29/2002 2:16:08 PM w/ Stan & Wendell re c/n...keep c/n. complete all firestops, verify canopy modification approval 1/29/2002 6:16:20 PM
|
BLD01-02507
| BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 1/29/2002 3:31:57 PM floor line penetrations ok (curtain wall) ok to drop all tiles
|
BLD00-01150
| BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PASS |
|
|
Added by Inspector: 340 On 1/29/2002 3:36:06 PM w/ prop mgr, keep c/n's re upgrade
|