BLD02-00005
| BLD-Energy code compliance | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
ED ###-####
|
MEC01-03242
| Final | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 14:31:33. Contact: ###-####.
|
MEC02-00233
| Final | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 14:32:22. Contact: ###-####.. ok gas bbq line and stub for future gas stove. 1/29/2002 1:33:08 PM
|
MEC02-00224
| Pressure Test | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 15:45:58. Contact: ###-####.
|
BLD01-02752
| BLD-Final | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 07:43:12. Contact: ###-####.
|
BLD01-00308
| BLD-Conference | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by Inspector: 407 On 1/29/2002 1:36:38 PM stoped by. as i had anticipated another inspection by now noted interior shear walls not done correct. Will need to recall. 1/29/2002 1:40:43 PM
|
BLD02-00149
| BLD-Footing | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/28/2002 at 10:19:30. Contact: ###-####.appears ok no rebar req in footing. 1/30/2002 9:16:01 AM r 1/30/2002 9:16:47 AM
|
BLD01-00737
| BLD-Framing/Rough-in | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
###-#### fourth floor walls ok to insulate except for 2 hr area sep walls and electrical room. 1/30/2002 9:15:07 AM
|
BLD01-03230
| BLD-Other | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 08:58:25. Contact: ###-####.grid work in lower flor east side small arae on plans. 1/30/2002 9:15:40 AM
|
BLD01-00308
| BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | FAIL |
|
|
###-#### This is not a final . It is frame insp of the interior shear wall that has been part covered , I stoped by and talked with the person doing the work, told them to call for a pm inspection . So that I could again explain how to construct shear walls./2002 9:16:45 AM 1/30/2002 9:19:03 AM
|