BLD01-02400
| BLD-Aging Inspection | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | | PASS |
|
|
permit active 1/29/2002 7:52:37 AM
|
BLD01-02562
| BLD-Framing/Rough-in | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 07:03:49. Contact: ###-####. ok to insulate---fire damper needed in 1-hr fire wall prior to passing at final. 1/29/2002 8:52:18 AM
|
BLD01-01668
| BLD-Framing/Rough-in | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
ED ###-#### Building #4 1/29/2002 9:31:19 AM
|
BLD01-01669
| BLD-Framing/Rough-in | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
ED ###-#### Building #5 1/29/2002 9:31:37 AM
|
BLD01-01662
| BLD-Other | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PASS |
|
|
THIS FIRE WALL DEVIDES 2 BLD'S OTHER BLD PERMIT # IS 01-01665 ED ###-#### 1st layer of two hour separation wall in between building 2-A & B. 1/29/2002 9:32:25 AM
|
BLD02-00079
| BLD-Footing | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 07:22:12. Contact: . wip 1/29/2002 10:24:21 AM
|
BLD01-03133
| BLD-Framing/Rough-in | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | NR |
|
|
shear wall insp- randy-- ###-####-or troy ###-#### No approved plans on site. 1/29/2002 2:12:45 PM
|
BLD01-02197
| BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PASS |
|
|
randy-- ###-#### fn gar code is 7550 C. of C. #22150 issued. 1/29/2002 12:42:39 PM
|
BLD01-02196
| BLD-Final | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PASS |
|
|
randy- ###-#### fn gar code is 7550 c. of c. #22149 issued. 1/29/2002 12:57:14 PM
|
BLD01-03118
| BLD-Framing/Rough-in | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 11:09:28. Contact: ###-####. Most items on 1-28-02 c/n are completed-2 are not--ok to insulate--will verify at energy these two items. 1/29/2002 1:12:04 PM
|
MEC02-00202
| Final | 1/24/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | FAIL |
|
|
DICK ###-#### Not ready for final--gas piping needs to be installed at time of inspection. 1/29/2002 1:38:47 PM
|
BLD02-00052
| BLD-Footing | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
###-#### wip--95% ready 1/29/2002 2:32:30 PM
|
BLD02-00049
| BLD-Footing | 1/28/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PART |
|
|
###-#### 95 % ready 1/29/2002 2:32:50 PM
|
BLD01-02562
| BLD-Energy code compliance | 1/29/2002 | 1/29/2002 | 1/29/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 01/29/2002 at 07:04:54. Contact: ###-####. Insulation verified in building BUT per Table 5-A of 97 UBC opening IS NOT allowed (even with damper) on a S-2-type with in 5 feet even if protected. 1/29/2002 1:49:30 PM
|