MEC02-03404
| Final | 1/28/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | A | PASS |
|
|
###-####
|
MIS02-00213
| BLD-Final | 1/28/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | A | PASS |
|
|
re-insp john ###-####--pending fir fn OK for final Occ. 1/31/2003 12:44:22 PM
|
MEC01-03606
| Final | 1/24/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | A | PASS |
|
|
###-####
|
MEC01-03606
| Pressure Test | 1/24/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | A | PASS |
|
|
interm gas. 1/29/2003 10:24:16 AM
|
BLD03-00098
| BLD-Final | 1/28/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 01/28/2003 at 12:43:09. Contact: ###-####. Need separate Elect or Plumb permits as needed, Temp glass door, paved driveway and back up area, Truss eng to OK and provide paper for 2x6 in lieu of Lat braces. 1/29/2003 2:23:08 PM 1/29/2003 2:26:47 PM
|
BLD03-00076
| BLD-Footing | 1/29/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 01/29/2003 at 06:28:30. Contact: ###-####.
|
BLD02-02606
| BLD-Final | 1/29/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | P | PASS |
|
|
anthony; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/C issued. 1/29/2003 4:41:23 PM
|
BLD02-02722
| BLD-Final | 1/29/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | P | FAIL |
|
|
anthony ###-#### NR 1/29/2003 3:05:21 PM
|
BLD02-02648
| BLD-Final | 1/29/2003 | 1/29/2003 | 1/29/2003 12:00:00 AM | P | PASS |
|
|
anthony ###-#### C/C issued 1/29/2003 4:40:58 PM
|