ELE07-00182
| Electrical Rough-In | 1/29/2007 | 1/29/2007 | 1/29/2007 3:54:27 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/29/2007 at 9:01:06 AM. Contact: ###-####. ok to cover front area walls only
|
ELE07-00167
| Rough-In Permanent Service | 1/26/2007 | 1/29/2007 | 1/29/2007 2:52:06 PM | P | PASS |
|
|
Contact Bob Phone #: ###-#### ric ok, p/s u/g n ok
|
ELE07-00174
| Rough-In Permanent Service | 1/26/2007 | 1/29/2007 | 1/29/2007 2:44:32 PM | P | PASS |
|
|
Contact Bob Phone #: ###-#### ric ok, p/s u/g n ok
|
ELE06-03457
| Final | 1/29/2007 | 1/29/2007 | 1/29/2007 1:55:58 PM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 1/29/2007 at 8:24:07 AM. Contact: ###-####. called, told contr he didn't make corrections, left corr notice, nec 406.4 receptacles shall be rigidly mounted, 314 21 shall repair gaps around faceplates, 110.3(A) receptacles shall operate, 422.31(B) appliances shall have lock-out provisions- misc units
|
ELE06-03461
| Final | 1/29/2007 | 1/29/2007 | 1/29/2007 1:23:50 PM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 1/29/2007 at 8:25:02 AM. Contact: ###-####. called contr about bkr lo, ok to final
|
ELE07-00026
| Electrical Rough-In | 1/26/2007 | 1/29/2007 | 1/29/2007 11:38:25 AM | A | PART |
|
|
CEILING INSPECTION Phone #: ###-#### ok to cover west ceiling for first part of job
|
ELE07-00265
| Temporary Service | 1/26/2007 | 1/29/2007 | 1/29/2007 10:16:33 AM | A | PASS |
|
|
joe; Phone #: ###-#### Internet Inspection Request from: Victoria Beall corr made, t/s u/g n ok
|
ELE07-00287
| Electrical Rough-In | 1/26/2007 | 1/29/2007 | 1/29/2007 9:29:53 AM | A | PASS |
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ric ok,see final
|
ELE07-00287
| Final | 1/29/2007 | 1/29/2007 | 1/29/2007 9:29:15 AM | A | PASS |
|
|
jason; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to final
|
ELE06-04697
| Electrical Rough-In | 1/26/2007 | 1/29/2007 | 1/29/2007 9:17:00 AM | A | PASS |
|
|
randy - ceiling; Phone #: ###-#### Internet Inspection Request from: Victoria Beall ok to cover ceiling
|
ELE06-04269
| Final | 1/26/2007 | 1/29/2007 | 1/29/2007 8:59:37 AM | A | PART |
|
|
BOB, PLEASE CALL ME WHEN YOU ARE ON YOUR WAY OVER AND I WILL MEET YOU THERE, THANKS BILL Phone #: ###-#### elect ok, need to see lv before tiles installed
|
ELE06-00113
| Final | 1/26/2007 | 1/29/2007 | 1/29/2007 8:26:11 AM | A | PART |
|
|
CONTACT: GREG PACK - TEMPORARY OCCUPANCY INSPECTION Phone #: ###-#### signed struct card for hotel shell and garage foundations only, will do t/o ltr
|
ELE05-00855
| Final | 1/29/2007 | 1/29/2007 | 1/29/2007 8:24:23 AM | P | PART |
|
|
signed struct card for hotel shell and foundations, will final ltr
|