FIR08-00019
| INSP-Final Inspection | 1/25/2008 | 1/29/2008 | 1/29/2008 6:06:47 PM | P | PASS |
|
|
Fire alarm work passed field testing, one incorrect cd rating changed while on site, nac batteries and EOL tested okay, also verified door holder functionality.
|
FIR07-00662
| INSP-Alarm Testing | 1/28/2008 | 1/29/2008 | 1/29/2008 5:08:38 PM | A | FAIL |
|
|
See inspection notes per site visit completed by K. Roule.
|
FIR07-00851
| INSP-Sprinkler Rough-in | 1/29/2008 | 1/29/2008 | 1/29/2008 4:48:30 PM | P | PART |
|
|
See approvevd set of plans, note areas in red for OK to cover. KR
|
FIR07-00855
| INSP-Sprinkler Rough-in | 1/29/2008 | 1/29/2008 | 1/29/2008 4:28:47 PM | P | PART |
|
|
Over head ok to cover. KR
|
FIR06-00620
| INSP-Alarm Testing | 1/28/2008 | 1/29/2008 | 1/29/2008 3:35:49 PM | A | PART |
|
|
Tested horn strobe notification devices for the second floor mechanical and electrical room areas including the penthouse mech. except as noted per annotations (circut 52 and the 2nd floor corridor, noted one area lacking sufficient coverage, need weatherproof back box for the h/s at the roof deck, noted cd ratings on the as-built plans are not accurate to the field install at some locations, audibility is satisfactory.
|
FIR07-00997
| INSP-Sprinkler Rough-in/Hydro | 1/28/2008 | 1/29/2008 | 1/29/2008 3:28:03 PM | P | PART |
|
|
Hydrostatic tests for the overhead wet and antifreeze systems as well as the underground supply piping passed.
|
BLD07-03110
| FIRE-Final Inspection | 1/29/2008 | 1/29/2008 | 1/29/2008 1:21:06 PM | P | PASS |
|
|
Fire life safety finaled.
|
FIR07-00989
| INSP-Final Inspection | 1/29/2008 | 1/29/2008 | 1/29/2008 1:20:18 PM | P | PASS |
|
|
Permit finaled.
|
FIR08-00055
| INSP-Final Inspection | 1/29/2008 | 1/29/2008 | 1/29/2008 12:39:03 PM | P | PASS |
|
|
Fire sprinkler standpipe system modifications per the scope of work are satisfactory, inspection passed, permit finaled.
|
FIR07-01049
| INSP-Sprinkler Rough-in | 1/29/2008 | 1/29/2008 | 1/29/2008 12:26:43 PM | P | PART |
|
|
Verified completion of previous correction notice item, rough-in inspection passed, okay for final when ceilings are in place.
|
FIR07-00920
| INSP-Sprinkler Rough-in | 1/29/2008 | 1/29/2008 | 1/29/2008 12:23:51 PM | P | PART |
|
|
Overhead system modifications are acceptable for cover at the drop ceilings.
|
FIR07-01046
| INSP-Final Inspection | 1/29/2008 | 1/29/2008 | 1/29/2008 11:41:50 AM | P | FAIL |
|
|
Need to provide matched response heads at the mill/lathe and lab room areas.
|
BLD07-02828
| FIRE-Final Inspection | 1/25/2008 | 1/29/2008 | 1/29/2008 11:03:26 AM | A | FAIL |
|
|
A fire alarm permit will be necessary to interconnect the new smoke detectors at the two FSD's to the FACP or provide an approved building plan modification for deletion of the dampers, need to remove the manual flush bolts at the lathe room inactive door leaf, also the fire sprinkler permit needs to be finaled prior to life safety.
|
BLD07-02828
| FIRE-Sprinkler Rough-in | 1/28/2008 | 1/29/2008 | 1/29/2008 10:56:53 AM | A | FAIL |
|
|
Mixed response heads are not allowed within the same fire area at the new lab and lathe rooms.
|
FIR07-00855
| FIR-Aging Inspection | 1/29/2008 | 1/29/2008 | 1/29/2008 10:12:30 AM | | DONE |
|
|
Permit work has been scheduled for inspection.
|
FIR08-00011
| INSP-Final Inspection | 1/28/2008 | 1/29/2008 | 1/29/2008 9:22:04 AM | A | PART |
|
|
Work is acceptable pending two copies of as-built plans are provided reflecting the actual installation.
|