Inspections for the day of: Tuesday, January 29, 2008.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR08-00019 INSP-Final Inspection1/25/20081/29/20081/29/2008 6:06:47 PMPPASS
Fire alarm work passed field testing, one incorrect cd rating changed while on site, nac batteries and EOL tested okay, also verified door holder functionality.
FIR07-00662 INSP-Alarm Testing1/28/20081/29/20081/29/2008 5:08:38 PMAFAIL
See inspection notes per site visit completed by K. Roule.
FIR07-00851 INSP-Sprinkler Rough-in1/29/20081/29/20081/29/2008 4:48:30 PMPPART
See approvevd set of plans, note areas in red for OK to cover. KR
FIR07-00855 INSP-Sprinkler Rough-in1/29/20081/29/20081/29/2008 4:28:47 PMPPART
Over head ok to cover. KR
FIR06-00620 INSP-Alarm Testing1/28/20081/29/20081/29/2008 3:35:49 PMAPART
Tested horn strobe notification devices for the second floor mechanical and electrical room areas including the penthouse mech. except as noted per annotations (circut 52 and the 2nd floor corridor, noted one area lacking sufficient coverage, need weatherproof back box for the h/s at the roof deck, noted cd ratings on the as-built plans are not accurate to the field install at some locations, audibility is satisfactory.
FIR07-00997 INSP-Sprinkler Rough-in/Hydro1/28/20081/29/20081/29/2008 3:28:03 PMPPART
Hydrostatic tests for the overhead wet and antifreeze systems as well as the underground supply piping passed.
BLD07-03110 FIRE-Final Inspection1/29/20081/29/20081/29/2008 1:21:06 PMPPASS
Fire life safety finaled.
FIR07-00989 INSP-Final Inspection1/29/20081/29/20081/29/2008 1:20:18 PMPPASS
Permit finaled.
FIR08-00055 INSP-Final Inspection1/29/20081/29/20081/29/2008 12:39:03 PMPPASS
Fire sprinkler standpipe system modifications per the scope of work are satisfactory, inspection passed, permit finaled.
FIR07-01049 INSP-Sprinkler Rough-in1/29/20081/29/20081/29/2008 12:26:43 PMPPART
Verified completion of previous correction notice item, rough-in inspection passed, okay for final when ceilings are in place.
FIR07-00920 INSP-Sprinkler Rough-in1/29/20081/29/20081/29/2008 12:23:51 PMPPART
Overhead system modifications are acceptable for cover at the drop ceilings.
FIR07-01046 INSP-Final Inspection1/29/20081/29/20081/29/2008 11:41:50 AMPFAIL
Need to provide matched response heads at the mill/lathe and lab room areas.
BLD07-02828 FIRE-Final Inspection1/25/20081/29/20081/29/2008 11:03:26 AMAFAIL
A fire alarm permit will be necessary to interconnect the new smoke detectors at the two FSD's to the FACP or provide an approved building plan modification for deletion of the dampers, need to remove the manual flush bolts at the lathe room inactive door leaf, also the fire sprinkler permit needs to be finaled prior to life safety.
BLD07-02828 FIRE-Sprinkler Rough-in1/28/20081/29/20081/29/2008 10:56:53 AMAFAIL
Mixed response heads are not allowed within the same fire area at the new lab and lathe rooms.
FIR07-00855 FIR-Aging Inspection1/29/20081/29/20081/29/2008 10:12:30 AM DONE
Permit work has been scheduled for inspection.
FIR08-00011 INSP-Final Inspection1/28/20081/29/20081/29/2008 9:22:04 AMAPART
Work is acceptable pending two copies of as-built plans are provided reflecting the actual installation.